Similar Projects
Halls River Resort
New Construction - 135,223 SF
Conception
Homosassa, FL 34448

World Trade Center of the Americas
New Construction - 1,439,352 SF
Conception
$10,000,000 CJ est. value
Miami, FL

Bay Harbour Marina Village
New Construction - 30,000 SF
Design
$10,000,000 CJ est. value
Fort Myers Beach, FL 33931

Polo Glen at Lake Betty
New Construction - 7,981,500 SF
Design
Orlando, FL 32805

Icon Marina Village
New Construction
Sub-Bidding
$30,000,000 est. value
West Palm Beach, FL 33401

Markers Grove Isle
New Construction, Renovation - 126,350 SF
Post-Bid
$10,000,000 est. value
Coconut Grove, FL

Marina Del Mar II
New Construction - 974,469 SF
Post-Bid
$78,600,000 est. value
Sunny Isles Beach, FL

Midtown District Redevelopment
Results
Plant City, FL

Cops'n Kids Youth Center Garage Conversion
Renovation
Results
Tampa, FL 33600

Via Mizner
New Construction - 730,000 SF
Construction
$63,651,007 est. value
Boca Raton, FL 33432

Costa Hollywood
New Construction - 128,678 SF
Construction
$25,000,000 est. value
Hollywood, FL 33019

Electronic Arts Sports Office Building
New Construction - 180,000 SF
Conception
Orlando, FL 32801

One Island Park
New Construction
Design
Miami Beach, FL

Park View at Palmetto Bay
New Construction - 431,000 SF
Post-Bid
$10,000,000 CJ est. value
Palmetto Bay, FL

Y--Minor (Proj: 546-132) D/B: Construct 500 Space Expandable Parking Garage
Results
Miami, FL 33125

Last Updated 08/06/2019 02:40 PM
Project Title

Garage and Roadway Structural and Joint Improvements

Physical Address View project details and contacts
City, State (County) Jacksonville, FL   (Duval County)
Category(s) Heavy and Highway
Sub-Category(s) Parking Garage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description This project includes rehabilitation efforts for both the daily and hourly parking garages located at Jacksonville International Airport (JIA). The work includes repairs to the expansion joints of the upper airport road, replacing floor sealants in the existing parking garages, performing miscellaneous structural improvements, and the replacement of membrane roofs on the existing garage stair roofs.
Details
Division 02 - Existing Conditions, Subsurface Investigation, Demolition, Selective Site Demolition, Paving Removal.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 21 - Fire Suppression.
Division 26 - Electrical, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents