Similar Projects
Concrete Repairs and Maintenance
Term Contract
Design
Sanger, CA 93657

Harbor Administration Building Board Hearing Room & Executive Session Room Remodel
Renovation
Bidding
$3,700,000 CJ est. value
Los Angeles, CA 90731

Transit Maintenance Facility, Phase V - Entrance Gate Construction
Infrastructure
Bidding
$459,903 CJ est. value
Santa Clarita, CA 91321

Concrete Slabs for Outdoor Tables at Various Sites
Renovation
Sub-Bidding
$871,000 CJ est. value
Fresno, CA 93722

Concrete Slabs for Outdoor Tables at Various Sites
Infrastructure
Sub-Bidding
$871,000 CJ est. value
Fresno, CA 93721

Concrete Pad Installation - CHP Contra Costa
Alteration
Post-Bid
Martinez, CA

Concrete Repair Program - Phase XI
Infrastructure, Alteration
Post-Bid
$169,000 est. value
West Hollywood, CA 90069

General Engineering (A License) Construction, San Francisco, San Mateo, Santa Clara, and Alameda Counties
Infrastructure, Alteration
Results
$5,000,000 est. value

General Engineering (A License) Construction, San Joaquin, Stanislaus, and Tuolumne Counties, Hetch Hetchy
Infrastructure, Alteration
Results
$5,000,000 est. value
San Joaquin, CA 93660

Double Fiberized Micro Surface Treatment Project
Infrastructure
Bidding
$540,000 CJ est. value
Hanford, CA 93230

Concrete Cutting Services
Term Contract
Post-Bid
zh, CA 93510

Prewett Park Concrete Improvements Phase Three
Alteration
Results
$480,000 est. value
Antioch, CA 94531

Linnell-Brahma Park 6210 Brahma Street
Infrastructure
Bidding
$2,800,000 CJ est. value
Bakersfield, CA 93307

Downtown Visalia Streetlights and Paving Project
Infrastructure, Alteration
Post-Bid

Construction of Concrete Improvements in Residential Streets
Alteration
Results
Cerritos, CA

Last Updated 05/16/2023 10:37 AM
Project Title

Second Street Drainage and Parking Lot Improvements, Phase II

Physical Address View project details and contacts
City, State (County) Solvang, CA 93463   (Santa Barbara County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $912,593 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 19, 2022, construction is underway. A timeline for completion has not been confirmed. This project includes all mobilization, traffic control, and demolition necessary to complete the following: Installation of 36-inch storm drain, storm drain manholes, trash capture and diversion structures, retaining walls, earthwork, railings, concrete driveway, rock slope protection and all necessary fittings and appurtenances. Clear, grub, and grade proposed Parking Lot 5. questions are being received and will be addressed per addendum 2 on or before Friday June 17, 2022. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents