Similar Projects
RFQ Engineering - SRSTC North Section Roadway and Parking Lot Improvements
Infrastructure
Conception
$2,940,000 CJ est. value
Mauston, WI 53948

RFQ Engineering - SRSTC North Section Roadway and Parking Lot Improvements
Infrastructure
Conception
$2,940,000 CJ est. value
Mauston, WI 53948

Volk Field Main Loop Upgrade
Build-out, Renovation, Infrastructure
Bidding
$500,000 CJ est. value
Camp Douglas, WI 54618

Single and Double Seal Coating
Infrastructure
Post-Bid
$200,000 est. value
Necedah, WI

Main Street Alley and Property Grading
Infrastructure
Post-Bid
$200,000 est. value
Elroy, WI 53929

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Tennis Courts
Results
Mauston, WI 53948

Native American Church Parking Lot
Construction
Lyndon Station, WI 53944

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Arby's / Mauston
New Construction, Infrastructure - 2,676 SF
Pending Verification
$800,000 CJ est. value
Mauston, WI 53948

Pizza Ranch
New Construction, Infrastructure - 8,585 SF
Pending Verification
$2,700,000 CJ est. value
New Lisbon, WI 53950

Seal Coast Surfacing
Infrastructure
Post-Bid
$60,000 est. value
Elroy, WI

Main Street Alley Utility Replacement
Infrastructure
Results
Elroy, WI 53929

Paving Work on 26th Avenue (Swamp Road)
Infrastructure
Post-Bid
$80,000 est. value

Juneau County Structure Repair, B-29-18, 19, 44, 45
Infrastructure
Results
$75,000 est. value
WI

Last Updated 03/13/2023 08:15 AM
Project Title

New Lisbon - Necedah Const / Add Turn Lanes / Misc

Physical Address View project details and contacts
City, State (County) New Lisbon, WI 53950   (Juneau County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $883,070 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Excavation, Base, HMA Pavement, Asphaltic Surface, Beam Guard, Pavement Marking, Signs. Estimated Range $500,000 - $749,999 With each sealed proposal, the bidder must include a properly executed bid bond or a cashier's check, certified check, bank's check, or postal money order in the amount designated on the Highway Work Proposal made payable to the Department. Certified checks shall be drawn on the account of the bidder submitting the proposal. The bidder may also satisfy the proposal guaranty requirements by having a properly executed annual bid bond on file with the Department. Contractors should submit all questions concerning plans and/or proposals through Website. This process is documented and can be found at Website. WisDOT - 03 New Lisbon - Necedah Const / Add Turn Lanes / Misc *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents