Similar Projects
Main Street Enhancement Project
Post-Bid
$10,000 est. value
Orange, VA

West Great Neck Road Sidewalk
Post-Bid
Virginia Beach, VA

State HQ Modernization Parking Lot Extension
Results
Richmond, VA 23297

Matthew Whaley Elementary School Parking Lot Improvements Project
Results
$472,304 est. value
Williamsburg, VA 23185

Sidewalk Trip Hazard Removal
Term Contract
Post-Bid
Buchanan, VA 24066

Site Repairs and Improvements
Term Contract
Results
Chesapeake, Norfolk, Portsmouth, Suffolk, Virginia Beach, VA 23320

Driveway, Slope and Grade Repair-Culpeper
Post-Bid
Culpeper, VA 22701

Street Maintenance Services
Term Contract
Results
Smithfield, VA 23430

Parking Area Upgrades
Post-Bid
Tasley, VA

Phase 3 Sidewalk Enhancements
Results
Rich Creek, VA 24147

Z--Sidewalk Replacement
Post-Bid
$100,000 to $250,000 est. value
Hampton, VA 23667

Sutton Drive Sidewalk
Results
Purcellville, VA 20132

FY 20 Concrete Sidewalk, Sidewalk Through Entrance, Curb, Curb and Gutter and Handicap Ramp Removal/Replacement
Post-Bid
Roanoke, VA 24011

Chandon Park Trail Improvements
Results
Herndon, VA 20172

Construction - Repave Parking Lot, Charlottesville VA
Post-Bid
Charlottesville, VA 22903

Reported 04/20/2021 01:04 PM
Project Title

Parking Lot Reconfiguration Project

Physical Address View project details and contacts
City, State (County) Roanoke, VA   (Roanoke City County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work involves the construction and reconfiguration of the existing long-term and short-term parking lots at Roanoke Blacksburg Regional Airport. Construction includes the addition of a round-about, modifications to the terminal loop road, Thirlane Road, and the parking lot entry and exit configuration. The existing exit canopy will be demolished to include the booths. A new entry/exit canopy will be constructed.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents