Similar Projects
Manor Commons SE Commercial Lot - Shared Driveway with DQ Grill & Chill
Design
Manor, TX 78653

Ullrich WTP Process Drain and Support Systems Improvements
Renovation, Infrastructure
Bidding
$11,480,495 est. value
Austin, TX 78746

Local Mobility ADA Sidewalk and Ramp IMPS Grp 26 IDIQ City Wide
Infrastructure
Bidding
$30,000,000 est. value
Austin, TX

Agriculture Complex Meat Lab Parking Lot
Alteration
Post-Bid

Concrete Sidewalk Removal and Replacement
Term Contract
Post-Bid
$90,000 est. value
Pflugerville, TX

Beachside Redevelopment at Galveston Island State Park
New Construction
Results
$11,625,000 to $13,440,000 est. value
Austin, TX 78744

ADA Ramp and Bus Stop Improvements 2021 Citywide IDIQ
Term Contract
Results
$1,500,000 est. value
Austin, TX

Public Safety Training Campus Running Track
Infrastructure
Bidding
$800,000 est. value
Austin, TX 78744

Waterstone Units A, B and C
Infrastructure
Post-Bid
Austin, TX

Sherman Parking Lot Repair
Results
Austin, TX

Canton Parking Lot
Results
Less than $89,000 est. value
Austin, TX

University Hills Branch Library Parking Lot Expansion
Results
Less than $500,000 est. value
Austin, TX 78723

Red River Enhancement
Results
$1,379,000 est. value
Austin, TX

Bee Cave Public 2021 Trail Improvements
Results
Less than $1,115,187 est. value
Bee Cave, TX

Meadow Lake Boulevard Street Extension
Infrastructure
Results
$2,480,000 est. value
Austin, TX 78744

Last Updated 02/18/2022 07:21 AM
Project Title

Airport Boulevard - North Lamar Boulevard to 55th Street

Physical Address View project details and contacts
City, State (County) Austin, TX 78799   (Travis County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $8,271,757
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists approximately 1.5 linear miles of corridor mobility improvements for Airport BLVD from North Lamar BLVD to US 290/Koenig LN intersections including the construction of sidewalks, shared-use paths, median construction, traffic signal improvements, street lighting, pavement markings, curb & gutter, drainage improvements, driveway reconstruction, ADA compliant bus stop improvements, rain gardens, utility adjustments, and pavement mill & overlay.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents