Similar Projects
Emergency Operations Center (EOC) Relocation Project - City of Southlake
Demolition, New Construction, Infrastructure - 3,000 SF
Conception
$1,703,000 CJ est. value
Southlake, TX 76092

Library and Multi-use Facility - 2022-83 - City of Southlake
New Construction, Infrastructure - 60,000 SF
Conception
$41,750,000 CJ est. value
Southlake, TX 76092

Fort Worth Country Day Lower School
New Construction, Infrastructure - 30,384 SF
Design
$12,862,400 CJ est. value
Fort Worth, TX 76109

Bethlehem Baptist Church
Addition, New Construction, Infrastructure - 55,000 SF
Design
$25,000,000 CJ est. value
Mansfield, TX 76063

Trail Lakes Apartments
New Construction, Infrastructure - 45,000 SF
Post-Bid
$6,500,000 CJ est. value
Fort Worth, TX 76133

Eagle Mountain-Saginaw ISD Elementary #18: Remaining Trades
New Construction, Infrastructure
Post-Bid
$35,000,000 CJ est. value
Fort Worth, TX 76179

Bransford Road Shared Use Path
Infrastructure
Results
$1,099,653 CJ est. value
Colleyville, TX 76034

North Richland Hills Paramount Street Sewer Replacement Project
Infrastructure
Results
$249,846 CJ est. value
North Richland Hills, TX 76117

Basswood Business Park / Buildings 3, 4 & 5
New Construction, Infrastructure - 351,283 SF
Construction
$26,350,000 CJ est. value
Fort Worth, TX 76131

Paloma Village
New Construction, Infrastructure - 445,296 SF
Construction
$100,000,000 CJ est. value
Fort Worth, TX 76177

Popeyes Louisiana Kitchen / Saginaw
New Construction, Infrastructure - 2,400 SF
Pending Verification
$725,000 CJ est. value
Saginaw, TX 76179

Stonemont-Harmon Road / Harmon Road Spec Warehouse
New Construction, Infrastructure - 485,680 SF
Pending Verification
$20,446,233 CJ est. value
Fort Worth, TX 76177

Municipal Complex
New Construction - 35,000 SF
Conception
$20,000,000 est. value
Benbrook, TX

Main Street Gasoline Service Station
New Construction, Infrastructure - 10,000 SF
Design
$2,640,000 CJ est. value
Mansfield, TX 76063

Pinnacle Montessori Academy / Ft Worth
New Construction, Infrastructure - 11,530 SF
Post-Bid
$2,340,590 CJ est. value
Fort Worth, TX 76177

Last Updated 02/15/2024 10:02 PM
Project Title

RFP Construction Manager at Risk - for Tim Curry Criminal Justice Center Elevator Tower Addition

Physical Address View project details and contacts
City, State (County) Fort Worth, TX 76102   (Tarrant County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Capitol/Court House/City Hall, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $9,703,051 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Selective demolition of existing West building facade and new construction to attach new 10-story elevator tower and connected exterior corridors from Lower Plaza Level 01A to Level 03. Site work to include new street corner radii with curb and gutter around the existing city block, new paving of Lamar Street with parking, planters, and landscaping. New structure is cased drilled concrete piers with concrete grade beams, structural steel framing, composite metal floor and roof decks Exterior finishes to match existing and include brick masonry veneer, cast stone panels, granite panels, decorative metal, aluminum windows, insulated and spandrel glazing, aluminum storefront entrances and framing, metal canopies, and 2-ply modified bitumen roofing. Interior finishes include hollow metal door frames, hollow metal and solid core wood doors, terrazzo flooring, carpet tile, gypsum board and metal stud wall and ceiling assemblies, acoustical panel ceilings, resilient base, large format wall tile, cast stone, paint, and solid surfacing. Facility services to include fire suppression, plumbing, heating, ventilation, air conditioning, electrical power, exterior and interior lighting, access control and security came. The source of funding for this Project is the Federal American Rescue Plan Act (ARPA) therefore it will utilize prevailing wage rate schedules of the United States Department of Labor adopted in accordance with the Davis-Bacon Act. Tarrant County reserves the right at its sole discretion to determine if presentations and interviews are in the best interest of the County. Tarrant County is under no obligation to request oral presentations. Question Deadline 02/12/2024 at 12:00 PM CT.

Details

12,943 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents