Similar Projects
Oldfield Point Road Improvements (Old Chestnut to Old Ferry) - 52594 - Cecil County
New Construction, Infrastructure
Conception
$15,600,000 CJ est. value
Elkton, MD 21921

Oldfield Point Road Improvements (Old Chestnut to Old Ferry) - 52594 - Cecil County
New Construction, Infrastructure
Conception
$15,600,000 CJ est. value
Elkton, MD 21921

Replace Roofs - Patient Buildings
Term Contract, Demolition, Renovation, Infrastructure
Design
$20,000,000 CJ est. value
Perry Point, MD 21902

US 40 (Pulaski Highway) at Nottingham Road Geometric Improvements in Cecil County
Infrastructure
Bidding
$2,500,000 CJ est. value
Elkton, MD 21921

US 40 (Pulaski Highway) at Nottingham Road Geometric Improvements in Cecil County
Infrastructure
Bidding
$2,500,000 CJ est. value
Elkton, MD 21921

Surface Abrasion and Diamond Grinding of Roadways at Various Locations Statewide
Infrastructure
Post-Bid
$1,000,000 to $2,500,000 est. value

Elevator Rehabilitation Project
Renovation
Post-Bid
$50,000,000 est. value
Washington, DC

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Results
Less than $75,000,000 est. value
Washington, DC

Fair Hill NRMA Phase 4 Paving
Results
Less than $50,000 est. value
Elkton, MD 21921

Gray Mount Commons
New Construction, Infrastructure
Pending Verification
$73,000,000 CJ est. value
Elkton, MD 21921

Clene Nanomedicine R&D Facility Expansion
Addition, Demolition, Infrastructure - 10,000 SF
Pending Verification
$725,000 CJ est. value
North East, MD 21901

Belvidere Road Improvements - 52705 - Cecil County
Infrastructure
Conception
$6,000,000 CJ est. value
Perryville, MD 21903

Elk Neck State Park Wastewater Treatment Plant ENR Upgrade
Infrastructure
Bidding
$2,000,000 CJ est. value
North East, MD 21901

Asphalt Overlay Calendar Year 2022
Term Contract, Infrastructure
Post-Bid
$2,500,000 est. value

Street Repair Services
Alteration
Results

Last Updated 12/09/2022 03:06 PM
Project Title

Mid-County Transit Hub - 580 - Cecil County

Physical Address View project details and contacts
City, State (County) Elkton, MD 21921   (Cecil County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Misc. Structures, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2025
Bids Due View project details and contacts
Estimated Value $5,080,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A Mid-County Transit Hub has been recommended to support the growth of Cecil Transit, enhance transit ridership, reduce stem miles and provide additional office space. The Mid-County Transit Hub will look to contain: a multi-modal public transit center to accommodate transfers and layovers, a kiss-and-ride facility, a covered area for customer waiting, pedestrian/bicycle connectivity and bicycle parking and a stand-alone Transit Administration facility containing Transit offices; with the possibility of an onsite vehicle wash bay or reduced-capacity maintenance facility depending on future cost considerations. The Transit Hub will be developed in multiple phases: Phase 1 identified and evaluated 10 possible sites for the Transit Hub; Phase 2 selected and studied three viable sites for the location and determined size, scope and estimated costs associated with the planned project. Phase 3 currently involves land acquisition and engineering and design while Phase 4 involves construction of the Transit Hub and Administrative Offices. Please know thatland acquisition was approved in the FY21 budget and is scheduled to commence following completion of the National Environmental Protection Agency Act review and associated appraisals. Regarding funding allocations, this project is projected to be 80 percent Federally funded, 10 percent State funded (State funding has been cut, as such, current 10% is covered by County or savings incurred via other projects; State match may be restored in future years) and 10 percent County funded. The project is included in the county's 2023-2028 capital improvement plan (CIP). As of December 9, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Protective Covers, Transportation Stop Shelters.
Division 12 - Furnishings, Multiple Seating, Pews and Benches, Benches.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents