Similar Projects
Saddle Ridge
New Construction
Conception
Cheyenne, WY

Tenth Hole Estates - Phase III
New Construction - 3,000 SF
Conception
$1,000,000 to $5,000,000 est. value
Gillette, WY

FY23 Public Works Facility Garage Addition
Addition, Demolition, Infrastructure
Design
$420,000 CJ est. value
Torrington, WY 82240

Lower Valley Energy Workforce Housing
New Construction, Infrastructure
Design
$8,000,000 CJ est. value
Jackson, WY 83001

EMA/CLCPH Archer Storage Facility
New Construction, Infrastructure - 19,507 SF
Bidding
$3,000,000 CJ est. value
Cheyenne, WY 82007

Track Re-Surfacing
Infrastructure
Bidding
$300,000 CJ est. value
Rock Springs, WY 82901

Cheyenne Cemeteries Irrigation System Replacement
Infrastructure
Sub-Bidding
$3,090,372 CJ est. value
Cheyenne, WY 82001

Tunnel #2 Cave-in Restoration
Alteration
Post-Bid
Torrington, WY

Owner`s Representative for the Horizontal Infrastructure and Site Planning and Development
Infrastructure
Post-Bid
Jackson, WY 83001

District 3 Stockpiles
Infrastructure
Results

District 3 Stockpiles
Infrastructure
Results

Homestead Estates
New Construction
Construction
Cheyenne, WY

Storey Boulevard and Ridge Road Signalized Intersection
Infrastructure
Construction
$480,000 CJ est. value
Cheyenne, WY 82001

U-Haul of Gillette
New Construction, Infrastructure - 38,264 SF
Pending Verification
$4,000,000 CJ est. value
Gillette, WY 82718

Hyatt Place Hotel and Cheyenne Center
New Construction, Infrastructure - 70,000 SF
Pending Verification
$55,000,000 CJ est. value
Cheyenne, WY 82007

Last Updated 11/17/2022 11:05 AM
Project Title

Pipeline Estates Subdivision

Physical Address View project details and contacts
City, State (County) Green River, WY 82935   (Sweetwater County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a residential subdivision. As of November 17, 2022, this project is in the early planning stages, and is seeking approvals from the City of Green River. Information regarding the selection of an architect and general contractor has not been provided. A firm timeline has not been announced, however, construction is unlikely to begin prior to second quarter of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents