Similar Projects
Last Updated | 08/05/2022 04:01 AM |
Project Title | Carbon River Road Erosion Control Mount Rainier National Park |
Physical Address | View project details and contacts |
City, State (County) | Carbonado, WA 98323 (Pierce County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $624,035 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Award Details Contract Award Date: Aug 02, 2022 Contract Award Number: 140P8322C0014 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: LFS1Y79ZP9H7 Contractor Awarded Name: JJH EARTHWORKS LLC Contractor Awarded Address: , WA 98155-5311 USA Base and All Options Value (Total Contract Value): $624035 MAGNITUDE OF CONSTRUCTION: In accordance with FAR 36.204 the estimated magnitude of this construction project is between $250,000 and $500,000. Request for Proposals #140P8322R005 is for construction services for stabilizing and mitigating further erosion of the roadway embankment of the damaged Carbon River Road. THIS IS NOT A GOVERNMENT ESTIMATE" In accordance with FAR 36.204 the Magnitude of Construction: between $250,000 and $500,000. This project is subject to Construction Wage Rate Requirements. Site Visit: A site visit is planned for Thursday, May 26, 2022 at 10:00 am PDT. Kindly RSVP to zachary_martin@nps.gov by noon on May 24, 2022. Location: Immediately prior to the Mount Rainier National Park Carbon River Entrance. On the Carbon River Road / Fairfax Forest Reserve Road E less than a quarter mile past the intersection with NF-7810. Lat/Long: 46.99497, -121.91636 Type of Contract: a Firm-Fixed-Price contract will be awarded Set-Aside: This procurement is 100% set-aside for Small Business concerns in accordance with FAR part 19.5. Instructions: To complete this SF1442, write the business name, address, DUNS number, and point of contact in Block 14 and complete Blocks 15 through 20C, including acknowledging all amendments in Block 19. Complete Price Schedule and return with documents listed in Section L. Additional instructions and a list of forms are provided in Section L. Blank price schedule and other required and optional documents are hyperlinked to the solicitation at SAM.gov. Administrative POC: Michael Beatty Contracting Officer PH: 360-854-7219 Email: michael_beatty@nps.gov Delivery: 45 Days After Notice to Procee PROJECT LOCATION: Carbon River Road/Fairfax Forest Reserve Road E approximately a quarter mile past the intersection with NF-7810, Mount Rainier National Park, Longmire WA. Maps and information are at www.nps.gov/MORA. INQUIRIES 1. To ensure questions are adequately addressed, questions must be received no later than SEVEN calendar days prior to the proposal due date shown in the latest amendment. Questions and/or comments received after this time may or may not be addressed prior to the solicitation closing date. Note: Amendment(s) to the solicitation answering any questions relative to these documents will be timely posted at SAM.gov. 2. Send written inquiries to michael_beatty@nps.gov. 3. "Or Equal" product requests: The Government's evaluation of requests to substitute specified products will be made after contract award as part of the submittal review process (reference FAR clause 52.236-5). Site Visit (Construction) (FEB 1995) (a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, the Offeror is urged and expected to inspect the site where the work will be performed. (b) A site visit is planned for Thursday, May 26, 2022 at 10:00 am PDT. (c) Kindly RSVP to zachary_martin@nps.gov by noon on May 24, 2022. (d) Location: Immediately prior to the Mount Rainier National Park Carbon River Entrance. On the Carbon River Road / Fairfax Forest Reserve Road E less than a quarter mile past the intersection with NF-7810. Lat/Long: 46.99497, -121.91636 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |