Similar Projects
Walnut Park - Water Meter Replacement Project
Infrastructure
Design
$1,600,000 CJ est. value
Huntington Park, CA 90255

SBWR Metering and Pressure Monitoring Improvements
Infrastructure
Design
$1,980,000 CJ est. value
San Jose, CA 95112

Various Locations Sewer Replacement No. 10
Infrastructure
Bidding
$5,450,000 CJ est. value
San Francisco, CA 94103

Ukiah Valley Sanitation District - North State Street - 8" Gravity Sewer Line
Infrastructure
Bidding
$350,000 CJ est. value
Ukiah, CA 95482

CHP Ventura Area Office - Plumbing Services
Term Contract
Sub-Bidding
Ventura, CA 93003

Encinitas Valve Replacement Project 2022
Renovation
Sub-Bidding
$1,160,000 CJ est. value
Encinitas, CA 92024

Modular Classroom Restroom Addition At Haynes Elementary School
Renovation
Post-Bid
Ontario, CA 91762

Building D 2nd Floor Labs Mechanical System Upgrades
Alteration
Post-Bid
$600,000 est. value
Long Beach, CA 90808

Plumbing Services
Term Contract
Results
$200,000 est. value
San Jose, CA 95128

Plumbing Contractor
Term Contract
Results
Concord, CA

Electrical, Framing, Mechanical, Flooring,Plumbing, Drywall
Alteration
Design
San Francisco, CA 94128

Center Friant-Kern Canal Turnout and Basin
Infrastructure
Bidding
$2,000,000 CJ est. value
Porterville, CA 93257

Plumbing Services BPA
Term Contract, Alteration
Post-Bid
Edwards, CA

District Wide HVAC Replacements 11 Campuses (COVID) - Plumbing
Alteration
Results
$1,000,000 est. value
Hesperia, CA 92344

"As Needed" Plumbing Services
Term Contract
Post-Bid
Eureka, CA 95501

Last Updated 09/02/2022 11:09 AM
Project Title

Liquid Oxygen Tank A Replacement at Plant No. 2

Physical Address View project details and contacts
City, State (County) Huntington Beach, CA 92646   (Orange County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $3,300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

$2.5 to $3.3 million License Requirements A Restricted To Must meet one of the following restrictions: CADIR - Registered DIR Public Works Contractor Start/Delivery Date December 2022 Project Duration 500 calendar days Online Q&A Yes Q&A Deadline 08/29/2022 2:00 PM (PDT) OC San is seeking a Contractor to demolish its existing LOX tank and place a new tank to the existing concrete foundation with post installed anchor bolts. The pressure sustaining (horizontal) vaporizer associated with Tank A as well as instruments, piping, and valves mounted on and near Tank A will be replaced. Interconnecting piping between Tank A and the existing piping will be replaced as needed for the removal and installation of the new tank. The existing fill vaporizer and Tank B vaporizer will remain as is and most of the piping and valving will be re-used. OC SAN requires uninterrupted LOX supply for their treatment operations. Other Details OC San will hold 2 non-mandatory job site visits. Reservations MUST be made in order to attend. Response Format Electronic Project Type RFP (Request for Proposal) Response Types Cost File Response File Require Forms Exhibits C, G, H-O (required) Public Copy Type of Award Lump Sum

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents