Similar Projects
Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Post-Bid

Crack and Joint Sealant (MBE Only)
Term Contract
Post-Bid

Intersection - BRO-US 68-30.82 Safety
Results
Mount Orab, OH

Crack Sealing - CS-FY2022
Results

Blacktopping Elschlager Road
Infrastructure
Post-Bid
Russellville, OH 45168

Two Lane Resurfacing- CLE-US 50-07.80
Infrastructure
Results
Clermont County, OH

Road Work 2022
Infrastructure
Post-Bid
$136,000 est. value
Russellville, OH

Intersection-BRO-US 68-30.82 Safety
Infrastructure
Results
Brown County, OH

2021 Brown County Paving
Alteration
Results
Georgetown, OH

Hamer Road Resurfacing
Infrastructure
Results
$191,971 est. value
Georgetown, OH 45121

Two Lane Resurfacing - BRO-SR 505-00.00 PV
Infrastructure
Results
OH

Chip Seal- D10-Chip Seal FY2022 North
Infrastructure
Results

2021 OPWC County/Township Road Restructuring
Alteration
Results
Georgetown, OH 45121

Two Lane Resurfacing - BRO/HIG-SR 134-00.00
Infrastructure
Results
$893,263 est. value

Reported 05/28/2022 12:00 AM
Project Title

2022 Pavement Rehabilitation Program

Physical Address View project details and contacts
City, State (County) Georgetown, OH 45121   (Brown County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $212,113
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Free Soil Road: 1 1/2" milling and resurfacing of Free Soil Road from the southern corporation limit for the Village of Georgetown to the S. Main Street intersection. Three areas of 3" milling and resurfacing and three areas of full depth pavement removal and replacement have been identified on the pavement replacement plan. The installation of aggregate drains in the full depth pavement replacement areas is included. Project includes the replacement of edge lines, center lines and stop lines. Bids are requested for the following Contract: 2022 Pavement Rehabilitation Program Owner anticipates that the Project's total bid price will be approximately $212,113.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents