Similar Projects
Substation Testing
Term Contract
Bidding
$25,000 to $100,000 est. value
Tooele, UT

Request For Information: Steel Structures for Western Area Power Administration (WAPA)
New Construction, Term Contract
Post-Bid

Request For Information: Steel Structures for Western Area Power Administration (WAPA)
New Construction, Term Contract
Post-Bid

Lehi City Ashton Substation Building
New Construction
Results
Less than $160,000 est. value
Lehi, UT

Enterprise Elementary School Addition
Addition - 4,692 SF
Results
Enterprise, UT 84725

Dominion Energy Station
New Construction
Pending Verification
Saratoga Springs, UT

Sky Mountain Power Substation
New Construction
Pending Verification
Hurricane, UT 84737

New Water Reclamation Facility Project SW-2 Standby Power and Susbstation
New Construction, Infrastructure, Alteration
Post-Bid
Salt Lake City, UT 84116

Last Updated 10/29/2021 08:25 AM
Project Title

State of Good Repair Traction Power Substation (TPSS) Rehabilitation

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT   (Salt Lake County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Electric Substation
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the design, procurement, installation, construction, testing , and integration services for the provision and installation of necessary equipment as described in Part 1 of this RFP and the Preliminary Drawings and Specifications provided (upon request) by UTA, including provisions for one (1) Portable TPSS (PTPSS). Optional work may be exercised under this contract as described in the RFP documentation. This project will be a Design-Build project. The contractor shall utilize the UTA Preliminary Drawings and Specifications to prepare a Firm-Fixed price for this contract. Project Phasing that promotes the most efficient schedule, cost, and impact to UTA should be presented by Proposer.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Power Distribution Units, Transfer Switches.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents