Similar Projects
Old Town Area Pipe Bursting
Post-Bid
Beaumont, TX 77701

Sewer Manhole Replacement and Frame/Cover Adjustment Work Order Contract
Post-Bid
Beaumont, TX 77701

Concrete Sewer Rehabilitation
Results
Less than $4,482,803 est. value
TX

Pipe Bursting Work Order Contract Phase III
Results
Beaumont, TX

On-Call Plumbing/Sewer and Drain Services
Term Contract
Post-Bid
Port Arthur, TX 77640

Sump Pump Cleaning
Results
Less than $80,875 est. value
TX

Cement Liner Material for Manhole Rehabilitation
Term Contract
Post-Bid
Beaumont, TX 77701

Riverfront Development Water and Sewer Project
Results
Less than $88,859 est. value
Port Neches, TX 77651

Valve Repair and Dress-Up Contract
Post-Bid
Beaumont, TX 77707

Sanitary Sewer Rehabilitation, 2020 Bond Project
Results
Port Neches, TX 77651

Groves Sanitary Sewer System Rehabilitation
Post-Bid
$278,000 est. value
Groves, TX 77619

2020 Bond Main A Lift Station Force Main Rehabilitation
New Construction
Results
Port Neches, TX

Grigsby Lift Station Rehabilitation Project
Post-Bid
Port Neches, TX 77651

Construction for Sanitary Sewer Rehabilitation (Easement - South 14Tth and South 13th Street)
Post-Bid
Nederland, TX

Environment Consultant for Water & Wastewater
Post-Bid
Port Arthur, TX 77641

Reported 12/20/2019 12:00 AM
Project Title

Dowlen West Pipe Bursting Contract - Phase I

Physical Address View project details and contacts
City, State (County) Beaumont, TX 77701   (Jefferson County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,300,000
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: 1. Provide a construction schedule to facilitate scheduling of work to be performed by the OWNER and others. The CONTRACTOR will be required to submit for the Engineer’s approval, a construction sequence of the phased installation for the proposed work. The OWNER shall reserve the right to make adjustments to the construction sequence to limit the number of service interruptions. 2. Provide bypass pumping and sewer flow control during the pipe bursting and manhole replacement operations, as necessary. 3. The project includes the rehabilitation of existing sanitary sewer lines by pipe bursting approximately 14,000 L.F. of existing six and eight-inch sanitary sewer mains to eight-inch (8.625 OD”) and approximately 3,200 L.F. of existing ten-inch sanitary sewer mains to ten inch (10.75 OD”) High Density Polyethylene (HDPE) pipe, as well as related manholes and service connections.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents