Similar Projects
Scheduled and Emergency Bridge Deck Repairs and Related Work at Various Locations
Bidding
Less than $923,540 est. value

East Road over West Brook Bridge Replacement Project
Bidding
$1,140,000 est. value
Orange, MA 01364

Chestnut Hill Loop Bridge Over Chestnut Hill Brook
Post-Bid
Less than $400,000 est. value
Montague, MA 01351

Scheduled and Emergency Bridge Deck and Joint Repairs at Various Locations
Results
Less than $1,489,000 est. value

Bridge Structure Repairs (Including Painting) at Various Locations
Results
Less than $960,000 est. value

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Bidding

2 Bridge Replacements BR NOS G-12-052 and G-12-053 (Steel) Interstate 91 (NB and SB) Over the Pan AM Railroad
Results
Less than $18,875,365 est. value
Greenfield, MA 01301

Scheduled and Emergency Bridge Structural Repairs at Various Locations
Results
Less than $1,267,525 est. value

Scheduled and Emergency Bridge Deck and Joint Repairs at Various Locations
Results
Less than $2,859,275 est. value

Bridge Replacement - Bridge No. R-10-003 on King's Highway over Pelham Brook
Results
Less than $475,000 est. value
Rowe, MA

Scheduled and Emergency Bridge Superstructure Repairs and Related Work (Including Painting) at Various Locations
Results
Less than $1,786,000 est. value

Scheduled and Emergency Bridge Repairs and Related work (Including Painting) at Various Locations on Interstate 90
Results
Less than $3,911,000 est. value

Williamsburg Road Bridges Over Sanderson Brook
Results
Less than $520,000 est. value
Whately, MA 01093

Bridge Replacement BR No C-05-037 (Next D Beams) West Oxbow Road Over Wilder Brook
Results
Less than $1,430,886 est. value
Charlemont, MA 01339

Bridge Superstructure Repairs and Related Work at Two Locations
Results
Less than $1,232,678 est. value

Last Updated 07/29/2020 10:23 AM
Project Title

Bridge Replacement BR No O-03-021 (Steel) Route 2 (Mohawk Trail) Over Route 202 (Daniel Shays Highway)

Physical Address View project details and contacts
City, State (County) Orange, MA 01364   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $15,132,952
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

"1.000","Ls","Schedule Of Operations - Fixed Price $90,000","100." "6.000","a","Clearing And Grubbing","101." "20.000","Hr","Control Of Invasive Plants Existing On Site","102.3" "8.000","Hr","Invasive Plant Management Strategy","102.33" "2.000","Ea","Tree Protection - Armoring & Pruning","102.511" "100.000","Ft","Tree And Plant Protection Fence","102.521" "1.000","Ls","Demolition Of Superstructure Of Bridge No. o-03-021","114.1" "8240.000","Cy","Earth Excavation","120." "10.000","Cy","Class a Rock Excavation","121." "1200.000","Cy","Reinforced Concrete Excavation","127.1" "2040.000","Cy","Bridge Excavation","140." "180.000","Cy","Class a Trench Excavation","141." "50.000","Cy","Test Pit For Exploration","141.1" "10.000","Cy","Class b Trench Excavation","142." "20.000","Cy","Class b Rock Excavation","144." "2.000","Ea","Drainage Structure Abandoned","145." "4.000","Ea","Drainage Structure Removed","146." "22100.000","Cy","Ordinary Borrow","150." "8400.000","Cy","Special Borrow","150.1" "10680.000","Cy","Gravel Borrow","151." "830.000","Cy","Gravel Borrow For Bridge Foundation","151.1" "1510.000","Cy","Gravel Borrow For Backfilling Structures And Pipes","151.2" "60.000","Ton","Crushed Stone","156." "20490.000","Sy","Fine Grading And Compacting - Subgrade Area","170." "1.000","Ton","Disposal Of Treated Wood Products","184.1" "21.000","Ea","Catch Basin","201." "2.000","Ea","Special Catch Basin - Double Grate","201.4" "6.000","Ea","Manhole","202." "2.000","Ea","Manhole (9 To 14 Foot Depth)","202.2" "1.000","Ea","Drop Inlet, Type Af","206.1" "1.000","Ea","Drainage Structure Adjusted","220." "1.000","Ft","Drainage Structure Rebuilt","220.2" "1.000","Ea","Drainage Structure Change In Type","220.3" "1.000","Ea","Drainage Structure Remodeled","220.5" "1.000","Ea","Frame And Cover","221." "8.000","Ea","Frame And Cover - Secured","221.1" "13.000","Ea","Frame And Grate - Massdot Bar Type","222." "1.000","Ea","Frame And Grate - Massdot Cascade Type","222.1" "2.000","Ea","Frame And Grate - Massdot Drop Inlet","222.2" "4.000","Ea","Frame And Grate (Or Cover) Municipal Standard","222.3" "2.000","Ea","Frame And Grate - Double","222.5" "10.000","Cy","Removal Of Drainage Structure Sediment","227.3" "120.000","Ft","Removal Of Drainage Pipe Sediment","227.31" "220.000","Ft","12 Inch Corrugated Metal Pipe 14 Gage","230.212" "60.000","Ft","12 Inch Reinforced Concrete Pipe","241.12" "20.000","Ft","18 Inch Reinforced Concrete Pipe","241.18" "2.000","Ea","18 Inch Reinforced Concrete Pipe Flared End","242.18" "880.000","Ft","12 Inch Reinforced Concrete Pipe Class v","244.12" "22.000","Sy","Stone For Pipe Ends","258." "131.000","Ft","12 Inch And Under Pipe Removed And Discarded","272.12" "4.000","Sy","Hot Mix Asphalt Waterway","280." "1.000","Ea","Gate Box Adjusted","358." "2060.000","Cy","Dense Graded Crushed Stone For Sub-Base","402." "2460.000","Sy","Pavement Standard Milling","415.1" "3250.000","Sy","Pavement Fine Milling","415.2" "180.000","Sy","Cement Concrete Base Course","430." "92300.000","Lb","Calcium Chloride For Roadway Dust Control","440." "110.000","Mgl","Water For Roadway Dust Control","443." "2360.000","Ton","Superpave Surface Course - 12.5 (Ssc - 12.5)","450.23" "2360.000","Ton","Superpave Intermediate Course - 12.5 (Sic -12.5)","450.31" "2400.000","Ton","Superpave Intermediate Course - 19.0 (Sic - 19.0)","450.32" "4660.000","Ton","Superpave Base Course - 37.5 (Sbc - 37.5)","450.42" "183.000","Ton","Superpave Bridge Surface Course - 9.5 (Ssc-b - 9.5)","450.60" "183.000","Ton","Superpave Bridge Protective Course - 9.5 (Spc-b - 9.5)","450.70" "30.000","Ton","Hma For Patching","451." "2360.000","Gal","Asphalt Emulsion For Tack Coat","452." "13700.000","Ft","Hma Joint Sealant","453." "110.000","Ton","Hot Mix Asphalt Berm, Type a","470." "130.000","Ton","Asphalt Mixtures For Temporary Work","472." "8870.000","Ft","Milled Rumble Strip","477." "1730.000","Ft","Milled Rumble Strip Removal","477.11" "160.000","Ft","Sawcutting Asphalt Pavement","482.3" "1410.000","Ft","Sawcutting Asphalt Pavement For Box Widening","482.5" "1030.000","Ft","Granite Curb Type Va4 - Straight","504." "70.000","Ft","Granite Transition Curb For Wheelchair Ramps - Straight","509." "30.000","Ft","Granite Edging Type Sb (Radius 10 Feet Or Less)","512.1" "6.000","Ea","Granite Curb Inlet - Straight","514." "1.000","Ea","Granite Curb Inlet - Double","514.1" "270.000","Ft","Curb Removed And Reset","580." "2780.000","Ft","Edging Removed And Reset","583." "5630.000","Ft","Guardrail, Tl-3 (Single Faced)","620.13" "2.000","Ea","Guardrail Tangent End Treatment, Tl-3","627.83" "6.000","Ea","Transition To Nchrp 350 Guardrail","628.21" "6.000","Ea","Transition To Bridge Rail","628.24" "50.000","Ft","Temporary Fence","657." "60.000","Ft","Temporary Fence Removed And Reset","657.5" "60.000","Cy","Stone Masonry Wall In Cement Mortar","685." "37.000","Ea","Silt Sack","697.1" "80.000","Sy","Geotextile Fabric For Separation","698.3" "580.000","Sy","Cement Concrete Sidewalk","701." "34.000","Sy","Cement Concrete Wheelchair Ramp","701.2" "1.000","Ea","Bound Removed And Reset","711." "41.000","Mo","Engineers Field Office And Equipment (Type a)","740." "1.000","Ls","Mobilization","748." "3040.000","Cy","Loam Borrow","751." "1.000","Ls","Npdes Stormwater Pollution Prevention Plan","756." "11390.000","Sy","Seeding","765." "11830.000","Sy","Seeding - Native Mix","765.11" "830.000","Ft","Sediment Control Barrier","767.121" "5990.000","Ft","Pavement Milling Mulch Under Guard Rail","769." "6.000","Ea","Spruce - Colorado Green 8-10 Feet","774.041" "5.000","Ea","Spruce - Serbian 8-10 Feet","774.238" "8.000","Ea","Oak - White 2-2.5 Inch Caliper","777.329" "3.000","Ea","Planetree - American 2-2.5 Inch Caliper","777.442" "3.000","Ea","Crabapple - 'Centurion' 1.5-2 Inch Caliper","778.413" "6.000","Ea","Hawthorn - Thornless Cockspur 1.5-2 Inch Capiper","781.243" "19.000","Ea","Serviceberry - Shadblow Clump 5-6 Feet","783.052" "1100.000","Sf","Roadside Guide Sign (g) Removed And Reset","829.01" "100.000","Sf","Warning-Regulatory And Route Marker - Alum. Panel (Type a)","832." "14.000","Sf","Reflective Sign Overlay","832.12" "120.000","Ea","Demountable Reflectorized Delineator - Guard Rail","833.5" "2.000","Ea","Delineation For Guard Rail Termini","833.7" "30.000","Ea","Reflectorized Flexible Delineator Post (Amber)","834.17" "30.000","Ea","Reflectorized Flexible Delineator Post (White)","834.18" "1.000","Ls","Supports For Relocated Guide Sign (g1) Steel","844.201" "1.000","Ls","Supports For Relocated Guide Sign (g2) Steel","844.202" "1.000","Ls","Supports For Relocated Guide Sign (g3) Steel","844.203" "1.000","Ls","Support For Relocated Guide Sign (g4) Steel","844.204" "1.000","Ls","Support For Relocated Guide Sign (g5) Steel","844.205" "1.000","Ls","Support For Relocated Guide Sign (g6) Steel","844.206" "1.000","Ea","Support For Guide Sign (e5-1a) Steel","846.1" "2.000","Ea","Sign Sup (n/Guide)+Rte Mkr w/1 Brkway s-Beam Post Asmbly. - St","846.2" "5.000","Ea","Sign Sup (n/Guide)+Rte Mkr w/1 Brkway Post Assembly - Steel","847.1" "3.000","Ea","Sign Sup (n/Guide)+Rte Mkr w/2 Brkway Post Assemblies-Steel","848.1" "50.000","Day","Traffic Cones For Traffic Management","851.1" "1300.000","Sf","Safety Signing For Traffic Management","852." "12.000","Ea","Portable Breakaway Barricade Type Iii","853.1" "700.000","Ft","Temporary Barrier (Tl-2)","853.2" "10060.000","Ft","Temporary Barrier Removed And Reset","853.21" "6890.000","Ft","Temporary Barrier - Limited Deflection (Tl-3)","853.33" "60.000","Day","Truck Mounted Attenuator","853.403" "11.000","Ea","Temporary Impact Attenuator Removed And Reset","853.501" "4.000","Ea","Temporary Impact Attenuator Unidirectional, Non-Redirective (Tl-2)","853.52" "4.000","Ea","Temporary Impact Attenuator Unidirectional, Non-Redirective (Tl-3)","853.53" "80.000","Day","Temporary Illumination For Work Zone","853.8" "3.000","Ea","Temporary Impact Attenuator Bi-Directional, Redirective (Tl-3)","853.83" "360.000","Ft","Temporary Roadway Delineator","853.9" "75000.000","Ft","Temporary Paving Markings - 6 Inch (Painted)","854.016" "1700.000","Ft","Temporary Pavement Markings - 12 In. (Painted)","854.022" "2100.000","Ft","Temporary Paving Markings - 6 Inch (Tape)","854.036" "30000.000","Sf","Pavement Marking Removal","854.1" "2270.000","Day","Portable Changeable Message Sign","856.12" "86200.000","Day","Reflectorized Drum","859." "4600.000","Day","Reflectorized Drums With Sequential Flashing Warning Lights","859.1" "22.000","Ea","Slotted Pavement Marker One-Way White","864.31" "12.000","Ea","Slotted Pavement Marker Two-Way White/Red","864.33" "40.000","Ea","Slotted Pavement Marker Two-Way Yellow/Red","864.34" "200.000","Ea","Slotted Pavement Marker Two-Way Yellow/Yellow","864.35" "11500.000","Ft","6 Inch Wet Reflective Recessed White Line (Polyurea)","868.206" "3.000","Ft","12 Inch Wet Reflective Recessed White Line (Polyurea)","868.212" "350.000","Ft","24 Inch Wet Reflective Recessed White Line (Polyurea)","868.224" "27000.000","Ft","6 Inch Wet Reflective Recessed Yellow Line (Polyurea)","869.206" "22.000","Ea","Traffic Sign Removed And Reset","874.2" "7.000","Ea","Traffic Sign Removed And Discarded","874.41" "8.000","Cy","4000 Psi, 1.5 In., 565 Cement Concrete","901." "6.000","Cy","Superstructure Concrete Patching - Surface Patch","909.31" "11.000","Cy","Superstructure Concrete Patching - Deep Patch","909.32" "160.000","Lb","Steel Reinforcement For Structures - Epoxy Coated","910.1" "1.000","Ls","Temporary Support Of Excavation","952.1" "750.000","Ton","Modified Rockfill","986." "940.000","Sy","Special Slope Paving Under Bridge - Cement Concrete","987.3" "1.000","Ls","Temporary Protective Shielding Bridge No. o-03-021","994.01" "1.000","Ls","Bridge Structure, Bridge No. o-03-021","995.01"

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents