Similar Projects
Rivoli Theater Stabilization
Renovation
Post-Bid
Indianapolis, IN 46201

WWTP Improvements Phase 2A - Sludge Processing Improvements and Phase 2B - New Sludge Processing Building
Post-Bid
Bristol, IN

Wastewater Utility Improvements
New Construction
Post-Bid
Versailles, IN

WPCP Odor Control Improvements
Results
Fort Wayne, IN 46802

Fox Island Commercial On-Site Wastewater Facility
Results
Less than $300,000 est. value
Fort Wayne, IN 46809

WWTP Rehabilitation and Expansion
Post-Bid
Sellersburg, IN

Peak Excess Flow Treatment Facility Project
Post-Bid
Kokomo, IN

WWTP Digester Cleaning
Results
Mishawaka, IN 46544

West Wastewater Treatment Plant (West WWTP) Renewable Natural Gas (RNG) System
Bidding
Evansville, IN

Wastewater Utilities Improvements
Results
Chesterfield, IN 46017

Wastewater Utility Rehabilitation
Post-Bid
Ladoga, IN 47954

WWTP Final Clarifier Nos. 4-5, Aeration Tank Nos. 1-4 and Disinfection
Results
South Bend, IN 46628

North Plant Clarifier No. 2 Repair
Results
Less than $164,000 est. value
Evansville, IN 47708

Last Updated 12/09/2020 03:22 PM
Project Title

Wastewater Treatment Plant Improvements

Physical Address View project details and contacts
City, State (County) Salem, IN   (Washington County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall include the construction of a chemical phosphorous removal building, modifications to the existing facilities for new chemical feed capabilities to the injection points at the existing aeration tanks; installation of chemical piping, connections, and appurtenances; chemical feed pump skid to provide chemical feed; chemical storage tanks; electrical and controls; HVAC; new asphalt pavement; replacing pumps in the aeration basin lift station; include new aerators in the three flow equalization lagoons; control switch in the control building for the lagoon effluent pump station; installation of a sludge screw conveyor, replace the existing effluent ultrasonic flow sensor with an electromagnetic meter in a new meter vault; and all associated work, demolition, and restoration for the Project.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents