Similar Projects
Cherokee Trail Phase 2B from Cherry Hill Park through Cherokee Park
Conception
$3,000,000 est. value
Cedar Rapids, IA 52405

Sanitary Sewer South of East Avenue/ West of 80Th Street
Conception
$830,000 est. value
Cedar Rapids, IA 52407

Oak Park Blvd Sewer Replacement Project
Infrastructure
Bidding
$865,000 est. value
Cedar Falls, IA 50613

Prairie Ridge Addition - Phase 1 Paving
Infrastructure
Bidding
Grundy Center, IA

Meskwaki Pedestrian Trail
Infrastructure
Post-Bid
Tama, IA

Hillandale Road and North West Boulevard, 76th Street and North West Boulevard
Infrastructure
Post-Bid
Davenport, IA 52805

Clover Lane Overlay
Results
Asbury, IA

Gilbert Court Sidewalk Infill
Results
Iowa City, IA

Lindale Trail Phase II from I-380 to Council Street North East
Conception
$1,200,000 est. value
Cedar Rapids, IA

FY23-24 Contract Sewer Repair Program
Term Contract
Bidding
Davenport, IA

Proposed Street Improvements - Middle Street and Prairie Street Paving
Infrastructure
Post-Bid
Mediapolis, IA 52637

Edgewood Road NW from Ellis Road to Cedar River Bridge Pavement Rehabilitation
Results
$1,380,000 est. value
Cedar Rapids, IA 52407

East Avenue Northwest, Shetland to Edgewood
Conception
$3,000,000 est. value
Cedar Rapids, IA

Czech Village 12th Avenue South West Detention Basin
Infrastructure
Bidding
$2,380,000 est. value
Cedar Rapids, IA 52497

Glen Eagles Trail Repairs
Infrastructure
Post-Bid
$43,000 est. value
Urbandale, IA 50322

Last Updated 03/24/2022 09:45 AM
Project Title

Ramp Parking Lot Improvements

Physical Address View project details and contacts
City, State (County) IA 51201   (Sioux County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $260,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work will consist of the construction of approximately 2,820 S.Y. 6 PCC Pavement 276 L.F. 15 RCP Storm Sewer and other related construction work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents