Similar Projects
Automated Metering Infrastructure
Bidding
Temple, GA

24-Inch Raw Water Main & 20-Inch Finished Water Main Extension
Infrastructure
Bidding
Monroe, Waco, GA

Water System Improvements
Post-Bid
Less than $1,050,000 est. value
Pavo, GA 31778

Metal Aluminized-Coated Pipe Annual Contract
Term Contract
Post-Bid
Gainesville, GA

Fire Hydrant and Gate Valves
Results
Atlanta, GA 30303

Chenocetah Drive Water and Sewer System Improvements
Results
Cornelia, GA 30531

Old Alabama Road 48-Inch Water Main Relocation Design Build
Infrastructure
Bidding
Atlanta, GA

Annual Contract for General Pipe Work
Term Contract
Post-Bid
Morrow, GA 30260

Water Meter Replacement and AMA Upgrade - DWSRF 19-013
Results
Less than $728,392 est. value
Montezuma, GA 31063

Williamson-Zebulon Road Water Extension
Infrastructure
Bidding
Zebulon, GA

Water System Improvements
Post-Bid
Dahlonega, GA 30533

CDBG- Water System Improvements
Results
Less than $474,621 est. value
Mount Zion, GA 30150

Water System Improvements
Infrastructure
Bidding
Chester, GA

Polyethylene Pipe Replacement Project
Post-Bid
Lawrenceville, GA 30046

Edge Road Water Main Addition
Results
Less than $558,640 est. value
Villa Rica, GA

Reported 12/01/2021 12:00 AM
Project Title

Northeast Downtown Water Main Replacement, Phase I

Physical Address View project details and contacts
City, State (County) Villa Rica, GA   (Carroll County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Division A: Under this division, the Contractor must furnish the labor and materials (except for 10”, 8”, and 6” pipe, fire hydrants, and gate valves) necessary to install approximately 4,000 LF of 10” water main, 100 LF of 8” water main, 550 LF of 6” water main, and all valves, fittings, bores, service transfers and other appurtenances necessary for complete installation. See Division B scope for specifics of what materials the City shall provide. All other materials shall be provided by contractors for Division A. Division B: Under this division, the material supplier must furnish the following materials: 4,350 LF of 10” C-900 PVC water main, 120 LF of 8” C-900 PVC water main, 600 LF of 6” C-900 PVC water main, 7 fire hydrants, and 22 valves (size 6” – 10”). All other materials will be provided by the contractor for Division A.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents