Similar Projects
Last Updated | 09/23/2021 04:02 PM |
Project Title | Cherokee High School PAC Stage - Emergency Roof Repairs |
Physical Address | View project details and contacts |
City, State (County) | Evesham, NJ 08053 (Burlington County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | a. Removal and disposal of the existing EPDM roofing, roofing insulation and accessories completely to the structural deck. b. Preparation of the existing structural deck to receive the roofing system proposed. c. Protection and modification of existing flashings and accessories required to remain. d. Preparation of existing roofing substrates and structures as required to receive new roofing materials, including, but not limited to insulation, flashing, and roofing trim. e. Supply and installation of a new black 90 mil unreinforced EPDM single ply membrane (Firestone, Carlisle, or equal) installed over new recovery board and tapered insulation as required to achieve a minimum slope of ¼” per 1’-0”. f. may be required to accommodate new insulation depths. g. Protection of existing building finishes outside the scope of this contract indicated to remain, and adjacent walls finishes. h. Restoration of any building finishes outside the scope of this contract indicated to remain, and adjacent areas of the Owner’s site damaged as a result of the work of this contract. i. Extreme care shall be taken by the Contractor during installation of roofing systems to avoid any penetrations of conduit or equipment attached to deck system. The contractor shall survey the underside of the roof deck, including those areas above suspended acoustic panel ceilings, of roof areas scheduled for replacement, and shall verify the location of existing utilities, wiring, conduits and piping secured to the underside of the roof deck. j. Supply of the manufacturer’s total roofing system warranty, with 100 MPH wind speed rider and 90-mil Hail/Puncture Coverage. k. Warranties as specified. l. Temporary services specified and required. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |