Similar Projects
River Trunk Realignment Shackelford Pump Station
Infrastructure
Bidding
$8,000,670 est. value
Modesto, CA

FWTP Well Testing and Design
Infrastructure
Bidding
Sacramento, CA 95826

Southern Pump Station Project
Infrastructure
Post-Bid
$6,200,000 est. value
El Centro, CA 92244

Groundwater Treatment Plant Design-Build (Phase B)
New Construction, Infrastructure
Post-Bid
Anaheim, CA

Grayson Well 69 (Replacing Well 274)
Infrastructure
Results
$2,449,000 est. value
Grayson, Modesto, CA 95363

Treated Water Booster Pumps
Alteration
Results
CA

Well Destruction Program
Demolition
Bidding

Drilling and Construction of Well 32 and 33 Project
Infrastructure
Post-Bid
Colton, San Bernardino, CA 92324

Groundwater Flush to Waste Project
Infrastructure
Results
Sacramento, CA 95838

Construction of the Regional Water Reclamation Facility Monitoring Wells Project
Infrastructure
Bidding
$380,000 est. value
Desert Hot Springs, CA 92240

Well Pumping Plant 31, Fogg Street
Infrastructure
Post-Bid
$1,600,000 to $1,800,000 est. value
Colton, CA 92324

Chilled Water Pump Project
Infrastructure
Results
Marysville, CA 95901

Legends Well (W-76) Rehabilitation
Infrastructure
Bidding
$120,000 est. value
Sacramento, CA

Well and Pump Maintenance and Repair
Infrastructure
Post-Bid
$114,000 est. value
Napa, Suisun City, CA 94585

CA-Stone Lakes NWR-Pumps Rehab
Term Contract
Results
Elk Grove, CA

Last Updated 12/01/2021 12:00 PM
Project Title

Construction of Well 18

Physical Address View project details and contacts
City, State (County) Winton, CA   (Merced County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $450,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes installing and sealing a conductor casing, drilling a 955-foot deep hole, running an electric log and caliper log, and constructing, developing, and testing a 945-foot deep public supply well, using the reverse rotary drilling method.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents