Similar Projects
Construction Services for Jetty and Wing Wall Repairs In Kennebunk and Kennebunkport, Maine
Design
$1,000,000 to $5,000,000 est. value
Kennebunk, Kennebunkport, ME

Capehart Fluvial Geomorphology and Stream Restoration Reach A5
Infrastructure
Bidding
Bangor, ME

Water Line and Utility Vaults MM 47.1, MM 47.6, and MM 48.5
Infrastructure
Bidding
Less than $1,000,000 est. value
Portland, ME

Bayside Seawall Improvements
Post-Bid
Northport, ME 04849

Culvert Pipe
Post-Bid
Portland, ME

Senott Road Culvert Replacement
Results
Whitefield, ME

Adams Street Ditching and Culvert Replacement
Results
Farmingdale, ME

Instream Culvert Replacement
Infrastructure
Bidding
Appleton, Camden, Hope, ME

Ditching and Culvert Work
Post-Bid
Princeton, ME

Shoreline Stabilization Project at Footbridge Road
Results
Belfast, ME 04915

Drainage and Sidewalk Improvements
Infrastructure
Bidding
$70,000 est. value
Castine, ME

P-381 Multi-Mission Dry Dock #1, Portsmouth Naval Shipyard (PNSY), Kittery Maine
Post-Bid
$500,000,000 est. value
Kittery, ME

Slope Stabilization/project is located on Route 161 in the town of Allagash beginning 0.09 mile north of Carney Road and extends southerly 0.21 mile
Results
Less than $7,552,000 est. value
Allagash, Saint Francis, ME 04774

Cleanup and Decommissioning of the Former Mason Station Ash Ponds
Infrastructure
Bidding
Wiscasset, ME 04578

Captain Thomas Road Culverts Replacement
Post-Bid
$275,000 to $325,000 est. value
Ogunquit, ME 03907

Last Updated 07/07/2021 09:23 AM
Project Title

Franklin Pasture Sledding Hill

Physical Address View project details and contacts
City, State (County) Lewiston, ME   (Androscoggin County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work for the Franklin Pasture Sledding Hill shall consist of, but not be limited to, the complete and satisfactory construction of sledding hill. Work includes clearing and grubbing small trees and shrubs in the areas designated on the site plan, stripping topsoil and stockpiling, regrading the hill slope. The stockpiled topsoil will be spread over the regraded slopes, seeded and stabilized with hay mulch. Work also includes sediment and erosion control Best Management Practices.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents