Similar Projects
2020 Bond - New Elementary School - Southeast Polk Community School District
New Construction, Infrastructure
Conception
$25,000,000 CJ est. value
Altoona, IA 50009

11th Elementary School
New Construction
Design
Urbandale, IA

Geothermal Maintenance Services
Term Contract
Sub-Bidding
$250,000 CJ est. value
Des Moines, IA 50309

DMPS Harding - Monroe - Perkins Floor Finish Replacement Package 2
Renovation, Alteration
Post-Bid
Des Moines, IA 50313

Restroom Upgrades - Lovejoy & Pleasant Hill
Renovation
Post-Bid
$687,900 CJ est. value
Pleasant Hill, IA 50327

Ankeny Elementary 12
New Construction - 100,500 SF
Results
Ankeny, IA

Restroom Upgrades
Renovation
Results
Des Moines, Pleasant Hill, IA 50312

RFP Design - Engineering and Architectural Design Services-Solar PV.
Renovation
Post-Bid
$150,000 CJ est. value
Des Moines, IA 50309

Fairmeadows Elementary 2022 Storm Shelter and Renovation
Renovation, Addition
Results
West Des Moines, IA 50265

RFP Design - Architectural and Engineering Design Services-Restroom
Renovation
Post-Bid
$1,185,000 CJ est. value
Des Moines, IA 50309

King Elementary Gym Upgrade and Finishes
Renovation
Results
Des Moines, IA 50314

RFP Design - Architectural and Engineering Design Services - General
Renovation
Post-Bid
$2,239,000 CJ est. value
Des Moines, IA 50309

Hanawalt Elementary and Hubbell Elementary Restroom Renovations
Renovation
Results
Des Moines, IA 50312

Radon Testing and Mitigation Services
Term Contract
Post-Bid
$100,000 CJ est. value
Des Moines, IA 50309

DMPS North High School and Oak Park Elem Restroom Renovations
Renovation
Results
Des Moines, IA 50313

Last Updated 06/30/2023 09:04 AM
Project Title

Studebaker Elementary HVAC, Flooring, and Accessibility Improvements

Physical Address View project details and contacts
City, State (County) Des Moines, IA 50320   (Polk County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Construction start expected December 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Copy Center - 01/26/23
Owner View project details and contacts
Architect View project details and contacts
Description

All bids rejected by school board Construction/repair and/or installation of the following improvement(s): Bid No. B8890 Studebaker Elementary - HVAC, Flooring, & Accessibility Improvements The entire deposit will be refunded to bona fide Bidders upon the return of the Documents, in good condition to Beeline and Blue, within fourteen (14) days after award of the contract(s). Lump-sum bids will be received under one contract as described in the specifications. Bids will be opened and read aloud immediately after specified closing time for receiving bids. All interested parties are invited to attend. Consideration of the bids received, and the award of contract or other action may be made by the Board of Directors of the Des Moines Independent Community School District upon the proposals received in accordance with the law and the plans and specifications at its meeting to be held at 5:30 p.m. on February 21, 2023 in the District Board Room at 1800 Grand Avenue Des Moines Iowa or at any other published and/or posted location of the Board meeting. The Board of Directors may make the award to the lowest responsive, responsible bidder meeting specifications. The right is reserved to reject any or all bids, or any part thereof, and to waive informalities, and to enter into such contract or contracts as shall be deemed in the best interests of the Des Moines Independent Community School District. Work under the proposed contract shall be commenced immediately after the award of the contract and shall be completed and ready for operation not later than 180 calendar days after the notice to proceed, subject to any extension of time which may be granted by the Board of Directors. By virtue of statutory authority, a preference will be given to products and provisions grown and coal produced within the State of Iowa, and to Iowa domestic labor. All bids will be governed by applicable provisions in the Iowa Code and Board Policies. The Project includes replacement of existing HVAC equipment, flooring and improvements to building accessibility As of June 30, 2023, no rebid information available

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents