Similar Projects
New Water Treatment System
Term Contract, Alteration
Design
$25,000 to $100,000 est. value
Waldport, OR

Lookout Point Powerhouse Heat Pump Ventilation
Alteration
Design
$250,000 to $500,000 est. value
Lowell, OR 97452

Wood Burning Appliance HVAC Replacement
Renovation
Sub-Bidding
$500,000 CJ est. value
Portland, OR 97204

RFP Construction Manager - Richardson Hall Chiller and Controls Replacement CM/GC
Renovation
Sub-Bidding
$200,000 CJ est. value
Corvallis, OR 97333

Residential HVAC Contractors
Term Contract
Post-Bid
OR

Medford School District MSDEC Annex HVAC Upgrades
Renovation
Post-Bid
Medford, OR 97501

HVAC Filters, Installation and Coil Cleaning Services
Alteration
Results
$245,000 est. value
Hillsboro, OR

Pioneer Hall AC Replacement
Alteration
Results
$251,293 est. value
Bend, OR 97703

Refrigeration Repair and Maintenance Reissue
Term Contract
Sub-Bidding
Portland, OR 97227

Lake Oswego Library HVAC and Controls Upgrade
Alteration
Post-Bid
$140,000 to $180,000 est. value
Lake Oswego, OR 97034

Linn-Benton Community College Main Campus Takena Remodel Project
Alteration
Results
Albany, OR 97321

Milton Freewater Armory - HVAC System Upgrade
Renovation
Sub-Bidding
$850,000 CJ est. value
Milton Freewater, OR 97862

Industrial Chiller Maintenance
Alteration
Post-Bid
Eugene, OR

Design-Build for Mechanical or HVAC
Alteration
Results
Springfield, OR 97477

Wilsonville Campus RTU-6 Replacement
Renovation
Sub-Bidding
$500,000 CJ est. value
Wilsonville, OR 97070

Last Updated 12/08/2022 05:18 AM
Project Title

Central Distribution Center (CDC) HVAC Upgrades

Physical Address View project details and contacts
City, State (County) Salem, OR 97301   (Marion County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $655,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

PERFORMANCE BOND and PAYMENT BOND: The successful Bidder shall be required to furnish electronic copies of the original Performance Bond and a Payment Bond each in the total amount (100%) of the awarded Contract, executed in favor of the State of Oregon, to ensure faithful performance of the Contract and payment for services and goods. Each Bid shall be accompanied by a certified or cashier's check, irrevocable letter of credit (issued by an insured institution as defined in ORS 706.008, or Original Bid Bond payable to the Department of Corrections ("DOC") in an amount equal to ten percent (10%) of the total amount of the Bid. If Bidder wants to submit a certified or cashier's check, irrevocable letter of credit in lieu of all or a portion of the required performance bod, the Bidder shall contact the Single Point of Contract for instructions Liquidated damages of $460.00 will apply to the contract resulting from this ITB. Failure to substantially complete the Project by the, date of Substantial Completion, as specified in the Contract, will result in damage to the State of Oregon. Moreover, failure to fully complete the Project by the date of Final Completion, as specified in the Contract, will also result in damage to the State of Oregon Since actual damage will be difficult to determine, it is agreed that the Contractor shall pay to the State of Oregon, not as a penalty but as liquidated damages, $460.00 per calendar day elapsed in excess of the Substantial Completion date stated in Section 3 of this Agreement. Moreover, it is agreed that the Contractor shall pay to the State of Oregon, not as a penalty but as liquidated damages, $460.00 per calendar day elapsed in excess of the Final Completion date stated in Section 3 of this Agreement PURCHASER/SINGLE POINT OF CONTACT See "Purchaser" and "Info Contact" for this ITB in OregonBuys. This is the single point of contact for this ITB. Any questions or issues that may arise regarding the Specifications, the bidding process, and/or the award process shall be directed to the Purchaser/Single Point of Contact. Name Ryan N. Kirtley Phone: (971) 707-0238 E-mail: Ryan.N.Kirtley@doc.oregon.gov PROJECT COMPLETION DATES: Project Start Date: Ten (10) Calendar Days from NOTICE TO PROCEED Substantial Completion: One Hundred Eighty (180) Calendar Days from NOTICE TO PROCEED Final Completion: Two Hundred Ten (210) Calendar Days from NOTICE TO PROCEED PROJECT ESTIMATE: The following range is a project estimate for bonding purposes: $500,000-$800,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents