Similar Projects
SD 100 HVAC Inverter Replacement
Bidding
Salt Lake City, UT

Electric Heat Pump Water Heater
Term Contract
Bidding
Salt Lake City, UT

Parks and Recreation Building HVAC Upgrades
Post-Bid
Less than $497,592 est. value
Salt Lake City, UT 84104

Wall Mounted HVAC for Portable Classrooms
Term Contract
Post-Bid
Salt Lake City, UT 84070

Commercial HVAC and Building Controls
Term Contract
Results
Salt Lake City, UT 84114

Annual Contract for Air Handling Equipment Repairs(HVAC)
Term Contract
Results
Salt Lake City, UT 84115

Install Rooftop HVAC Units
Bidding
Riverton, UT

York OEM HVAC Parts and Equipment
Term Contract
Post-Bid
Salt Lake City, UT 84190

Chiller Replacement
Results
West Jordan, UT 84081

Salt Lake County Automatic Build DDC and HVAC Controls
Term Contract
Post-Bid
Salt Lake City, UT 84190

Procure and Install a Source Capture Exhaust System(S)
Results
Sandy, UT 84070

Commercial HVAC and Building Controls Pt.2
Term Contract
Post-Bid
Salt Lake City, UT 84114

Widtsoe DX Condenser and Air-Handler Replacement
Results
$400,000 est. value
Salt Lake City, UT 84112

H999--Test, Inspect and Certify Medical Air, Oxygen, Nitrus Oxide and Medical Vacuum Systems
Post-Bid
Salt Lake City, UT

DFCM Construction-Standard Low Bid-DWS Admin Building HVAC and Controls (Bas/Access)-Phase II
Results
$985,800 est. value
Salt Lake City, UT 84101

Last Updated 04/13/2021 11:14 AM
Project Title

Gourley Elementary School HVAC Upgrade

Physical Address View project details and contacts
City, State (County) Kearns, UT 84118   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of work includes: 1. Furnish all labor, materials, and equipment necessary for the completion of the mechanical and plumbing scope of work. 2. Furnish and install all motors specified in this Division and be responsible for the proper operation of electrical powered equipment furnished by this Division. 3. Furnish exact location of electrical connections and information on motor controls to Division 26. 4. Mechanical Contractor shall obtain the services of independent Test and Balance Agency. 5. Placing the air conditioning, heating, ventilating, and exhaust systems into full operation and continuing their operation during each working day of testing and balancing. 6. Making changes in pulleys, belts, and dampers, or adding dampers, as required for the correct balance as recommended by Balancing Contractor at no additional cost to Owner. 7. Air balance, final adjustment and test run. 8. The satisfactory performance of the completed systems is a requirement of this specification.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents