Similar Projects
Remedial Repair Attoyac Bayou Site 21
Infrastructure
Design
$250,000 CJ est. value
Nacogdoches, TX 75961

Main Street Retail & Offices
New Construction - 4,500 SF
Design
$500,000 est. value
Red Oak, TX

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Paving Facilities to Serve Prairie Ridge Phase 5
Infrastructure
Post-Bid
TX

San Marcos Aquatic Resources Center - Rehabilitation and Realignment of The Entrance Road
Term Contract
Results
$1,000,000 to $5,000,000 est. value
San Marcos, TX 78666

2021-2022 Annual Asphalt Rehabilitation Program
Term Contract
Results
Midlothian, TX 76065

McDonald's
New Construction - 6,003 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Waxahachie, TX 75167

Legacy Ranch Office Building - Shell
New Construction - 6,000 SF
Construction
$600,000 est. value
Waxahachie, TX 75165

7 Eleven - Ovilla Road / Glenn Heights
New Construction, Infrastructure - 4,088 SF
Pending Verification
$500,000 CJ est. value
Glenn Heights, TX 75154

7 Eleven - Ovilla Road / Glenn Heights
New Construction, Infrastructure - 4,088 SF
Pending Verification
$500,000 CJ est. value
Glenn Heights, TX 75154

Founders Row
Renovation, Addition - 1,700 SF
Design
$275,000 est. value
Midlothian, TX 76065

Grading Operations to Serve Prairie Ridge Phase 5
Infrastructure
Post-Bid
TX

Transportation Facility Development DAEP Facility Renovations - Foundation and Area Paving
Infrastructure
Results
Ennis, TX

Legacy Ranch Road Offices - Shell Building
New Construction - 6,500 SF
Construction
$800,000 est. value
Waxahachie, TX 75165

Snap Clean Car Wash / Midlothian
New Construction, Infrastructure - 5,084 SF
Pending Verification
$1,500,000 CJ est. value
Midlothian, TX 76065

Last Updated 05/10/2023 03:06 PM
Project Title

2023 Bond Passed - Maypearl Independent School District

Physical Address View project details and contacts
City, State (County) Maypearl, TX 76064   (Ellis County)
Category(s) Commercial, Education, Heavy and Highway, Laboratory
Sub-Category(s) Elementary School, Food/Beverage Service, Laboratory, Middle/Senior High School, Office, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $35,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The school district’s bond was approved by the voters. However, it is currently unknown if an architect, construction manager, and general contractor have been contracted with the school district. As of May 10, 2023, further details regarding design and construction timelines have not been identified. Proposition A: Lorene Smith Kirkpatrick Elementary School replace all carpeting throughout building, add wall panels for high traffic areas / creative learning spaces, Maypearl Middle School 5 additional classrooms 2 Science labs within classrooms additional restrooms. The addition will serve as a storm shelter for the middle school Maypearl High School larger cafetorium with UIL rated stage for performances, additional classrooms and Career Tech Education (CTE) labs, relocate campus offices in the new addition, the addition will serve as a storm shelter for the high school, relocate central administrative offices into remaining original one story portion of current high school, new front door and entry, with additional parking lot at the corner of Fourth Street and Phillips Street, new paving/parking replace asphalt parking lots and driving lanes with concrete, replace gravel parking lot at the primary with concrete, replace gravel transportation parking lot with concrete, district-wide HVAC replacement and upgrades, replace units throughout the district that are 20 years or older.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Laboratory Furniture, Multiple Seating, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, HVAC Fans, Ventilation Hoods, Commercial-Kitchen Hoods, Central HVAC Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents