Similar Projects
Santa FE High School Gym HVAC Replacement, Building 12
Post-Bid
Alachua, FL 32615

N059--FY20: Hot Deck Replacement
Post-Bid
Gainesville, FL 32608

Annual Chiller and Cooling Tower Maintenance Service Program
Term Contract
Results
Gainesville, FL 32601

Heating, Ventilation and Air Conditioning (HVAC) Replacement - North Region
Results

Kitchen Exhaust Hood Cleaning Services
Post-Bid
FL

HVAC Air Filtration Services
Term Contract
Results
FL

Air Conditioning System Replacement
Post-Bid
Gainesville, FL 32641

HVAC Replacement/Installation
Results
Gainesville, FL 32609

J041--Refurbish Air Handler Units
Post-Bid
Gainesville, FL

Air Handling Unit Replacement at Fine Arts D
Results
Gainesville, FL 32601

HVAC and Mechanical Products
Term Contract
Post-Bid

4120--Vertical AC Units
Results
Gainesville, FL 32608

Gemini ES CEP Upgrades
Post-Bid
Melbourne Beach, FL 32951

HVAC Water Systems Treatment (District-Wide)
Results
Alachua, Gainesville, High Springs, Newberry, FL

H341--Clean Air Handling Units (AHUs) and Heat Recovery Units
Post-Bid
Gainesville, FL

Last Updated 06/25/2021 10:35 AM
Project Title

Design-Build for the HVAC System at Camp Cuscowilla

Physical Address View project details and contacts
City, State (County) Micanopy, FL 32667   (Alachua County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This scope of work and specifications are provided to the Design-Build Contractor for information purposes only. Designer-Build Contractor assumes all the responsibility for site verification of equipment for replacement with VRF units, controls and other items required to successfully complete the HVAC replacements and meet the necessary building and safety codes as more fully described in the specifications and general conditions. Design-Build Contractor shall become familiar with details of work in the field and shall advise OWNER of any discrepancy prior to performing any tasks, including but not limited to existing and proposed equipment quantities, building and area locations, etc. The Design-Build Contractor shall thoroughly investigate and satisfy itself of the conditions affecting the work prior to construction start. It is the responsibility of the contractor to find HVAC units that meet the energy performance requirements. If the contractor is unable to find the units that meet the above stipulation, the Design-Build Contractor will immediately inform and consult with the County Project Coordinator for guidance.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents