Similar Projects
High Expansion Foam Install with Pumphouse
New Construction
Design
$1,000,000 to $5,000,000 est. value
Middle River, MD

MCC Replacement – Green Branch Wastewater and Mill Branch Wastewater Pump Station
Bidding
Laurel, MD

Heritage Harbor 2 Sewage Pumping Station
Bidding
$2,000,000 to $3,000,000 est. value
Annapolis, MD

Martingham Distribution Pump Replacement
Renovation
Post-Bid
Saint Michaels, MD 21663

Underground Storage Tank Conversion
New Construction, Demolition
Post-Bid
Ashton, Brentwood, Silver Spring, MD 20707

Stony Run Wastewater Pumping Station Upgrade
Results
$2,500,000 to $5,000,000 est. value
Baltimore, MD

Cedar Lane Water Pumping Station
Results
$2,500,000 to $5,000,000 est. value
MD

Heritage Harbor 2 Sewage Pumping Station Upgrades
Bidding
$2,000,000 to $3,000,000 est. value
Annapolis, MD

Colgate Stormwater Pumping Station Upgrade
Results
$2,000,000 to $3,000,000 est. value
Baltimore, MD

Construction of Newark Spray Irrigation Facilities
Results
Snow Hill, MD 21863

Smouses Mill Pumping Station Upgrades
Results
$125,000 est. value
Cumberland, MD 21502

Refurbishment of Little Anacostia Wastewater Pumping Station
Renovation
Results
$5,000,000 to $7,000,000 est. value
Capitol Heights, MD 20781

Daniels Area Wastewater Pump Station
Results
Less than $1,505,000 est. value
Columbia, MD 21046

Hyde Park Pumping Station Improvements—Consent Decree
Results
$2,500,001 to $5,000,000 est. value
Hydes, MD 21221

Cockeysville Pumping Station Improvements
Renovation
Results
$5,000,001 to $10,000,000 est. value
Cockeysville, MD 21030

Last Updated 10/29/2020 11:42 AM
Project Title

Marley Avenue SPS Upgrade

Physical Address View project details and contacts
City, State (County) Annapolis, MD 21401   (Anne Arundel County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes the following major items: Upgrade the two existing submersible pumps, new underground emergency storage tank, new emergency generator, new control panel(s), new wet well and valve vault supply fans, new chain link slide gate.

Details

Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Sheet Waterproofing, Elastomeric Sheet Waterproofing, Thermoplastic Sheet Waterproofing, Roof Accessories, Roof Hatches.
Division 09 - Finishes, Painting.
Division 22 - Plumbing, Facility Sanitary Sewerage, Sanitary Sewerage Pumps.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Raceway and Boxes for Electrical Systems, Wiring Connections, Low-Voltage Distribution Equipment, Electrical Cabinets and Enclosures.
Division 31 - Earthwork, Excavation and Fill, Excavation, Dewatering, Shoring, Sheet Piling, Steel Sheet Piling.
Division 32 - Exterior Improvements, Rigid Paving, Concrete Paving.
Division 48 - Electrical Power Generation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents