Similar Projects
Conveyance System Infrastructure Improvements: Sewer In-System Storage and Valve Remote Improvements
Infrastructure
Bidding
$5,000,000 est. value
Detroit, MI

Groundwater Well Drilling Services
Infrastructure
Bidding
West Olive, MI

OTT Story Superfund Site Operable Unit #2 Groundwater Remedy - Phase I
New Construction
Post-Bid
$5,000,000 to $10,000,000 est. value
Muskegon, MI

2021 Six-Inch (6") Trailer Mounted Centrifugal Trash Pump Purchase
Post-Bid
Mount Pleasant, MI

Water Well and Yard Hydrant Installation
Results
Rochester, MI 48306

Supply and Delivery of Parts for Gorman Rupp Pumps
Results
Camden, MI

2016 Bond Projects - Bailey Lake Elementary Well System Improvements
Post-Bid
Clarkston, MI 48348

Plugging, Drilling, Re-drilling and Site Restoration of Oil and Gas Wells
Results
Lansing, MI

William Stone #1 Orphan Well Project
Renovation
Post-Bid
Lansing, MI

Sewage Pump Outs
Term Contract
Results
Rochester, Rochester Hills, MI 48307

Wet Well Vactoring
Infrastructure
Post-Bid
Brighton, MI

Vault Pumping and Disposal Services for Hartwick Pines State Park
Results
Grayling, MI 49738

Leachate Pump and Sump Drainer
Infrastructure
Post-Bid
Livonia, MI

Tri County Test/Production Well
Results
Pierson, MI 49339

WWTP Backwash Pump
Infrastructure
Post-Bid
Novi, MI 48377

Last Updated 07/06/2022 08:02 AM
Project Title

2022 Well 6 Rehabilitation

Physical Address View project details and contacts
City, State (County) Mount Pleasant, MI   (Isabella County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work include the complete overhaul of the Well 6 vertical turbine pump, photo logging, well cleaning and rehabilitation, pump reinstallation and start-up. Removal of pump motor, Removal of pump discharge head, Removal of all column assembly (column, lineshaft, bearing retainers, etc.), Removal of pump bowl, Removal of suction pipe, Photo log of well before and after cleaning, Complete inspection report of above mentioned materials with photo documentation, Well cleaning, Reinstallation, chlorination, start-up and testing of pump.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents