Similar Projects
Plans for Construction of Baker Road Sidewalk Extension
Bidding
TX

Greenwind Chase Drive Sidewalk
Bidding
Houston, TX 77094

Sidewalk Improvements - Phase II
Post-Bid
Channelview, TX

Sidewalk Repairs and Richmond Avenue Median Curb Improvements
Post-Bid
$500,000 to $1,000,000 est. value
Houston, TX 77000

New Front Easement Reconnections
Results
Less than $1,875,000 est. value
Houston, TX

Safe Sidewalk Program
Results
$1,200,000 est. value
TX

Houston Bikeway Work Order Project
Bidding
$1,500,000 est. value
TX

2020 Annual Sidewalk Improvements
Post-Bid
Pasadena, TX 77506

Citywide Work Orders for CDSF Projects 2
Results
$3,250,000 est. value
TX

Surface Repair of Red Bluff Hike and Bike Trail
Post-Bid
Pasadena, TX 77501

Citywide Work Orders for CDSF Projects 3
Results
$4,250,000 est. value
TX

Intramural Gravel Lot Conversion
Post-Bid
Houston, TX 77204

Northgate Crossing Blvd Sidewalks, Pedestrian Lighting, Landscaping and Irrigation Improvements
Results
Spring, TX 77373

Elyson Overflow Channel South Trail Landscape
Post-Bid
Houston, TX 77002

Parking Lot LPHS - Construction
Results
La Porte, TX 77571

Last Updated 07/30/2020 03:46 PM
Project Title

Construction of Sidewalks and Transit Stops on Ella Boulevard, Kuykendahl Road, and Rankin Road for Harris County Precinct 1

Physical Address View project details and contacts
City, State (County) Houston, TX 77002   (Harris County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,378,529
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of furnishing all personnel, labor, equipment, materials, and incidentals necessary for the construction of approximately four (4) miles of six (6) foot wide concrete sidewalks with some locations with four (4) foot sidewalk. The scope of work also includes new Metro bus pads, decomposed granite, removal and replacement of damaged sidewalk, removal and replacement of driveways and ramps for Americans with Disabilities Act (ADA) compliance, small roadside ditch/swale, retaining wall with raised curb, storm sewer and sanitary sewer manhole rim adjustments, adjustments of sidewalk to avoid other utilities, signage and pavement markings, traffic control, and storm water pollution prevention.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents