Similar Projects
Resurfacing and Related Work on A Section of Interstate 90
Bidding
Less than $7,661,805 est. value
Hopkinton, Southborough, Westborough, MA

Pavement Preservation and Related Work (Including 6 Bridges) Along A Section of Interstate 495
Bidding
Less than $11,793,651 est. value
Bolton, Boxborough, Harvard, Littleton, MA

Complete Streets Projects - Bedford Road
Post-Bid
Less than $375,000 est. value
Carlisle, MA

2020 Mill and Overlay Street
Post-Bid
Less than $860,000 est. value
Everett, MA

Paving Repairs
Results
Less than $49,000 est. value
Littleton, MA 01460

Paving Repairs at Isaacs Lane
Results
Less than $49,000 est. value
Ayer, MA 01432

Traffic and Safety Improvements Lakeview Avenue from Hypine Road to Tennis Plaza Road
Bidding
$350,000 est. value
Dracut, MA

2020 Roadway Rehabilitation
Post-Bid
Less than $3,100,000 est. value
Everett, MA 02149

Roadway Surface Sealing Treatment - Asphalt Rubber Surface Treatment
Term Contract
Results
$239,237 est. value
Ashland, Millis, Natick, Sherborn, Southborough, Wellesley, MA

Roadway Resurfacing
Bidding
$445,000 est. value
Tewksbury, MA

Replacement of a Select Area of Deteriorated Concrete Paving
Post-Bid
Less than $49,500 est. value
Somerville, MA

DPW Roadway Reconstruction for Various Streets
Results
Less than $750,000 est. value
Wayland, MA 01778

Mill and Fill Road Repairs
Bidding
$48,320 est. value
Tewksbury, MA

2020 Crack Sealing of Various Roads
Post-Bid
Less than $25,000 est. value
Lincoln, MA

DPW Bituminous Concrete
Results
$600,000 est. value
Wayland, MA 01778

Last Updated 11/25/2020 11:55 AM
Project Title

Roadway Reconstruction and Related Work Along Route 126 (Pond Street)

Physical Address View project details and contacts
City, State (County) Ashland, MA 01721   (Middlesex County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $17,186,250
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

"1.000","Ls","Schedule Of Operations - Fixed Price $95000","100." "2.000","a","Clearing And Grubbing","101." "500.000","Ft","Tree Trimming","102.1" "16.000","Hr","Control Of Invasive Plants Existing On Site","102.3" "6.000","Hr","Invasive Plant Management Strategy","102.33" "12.000","Ea","Tree Protection – Armoring & Pruning","102.511" "725.000","Ft","Tree And Plant Protection Fence","102.521" "12.000","Ea","Tree Removed - Diameter Under 24 Inches","103." "6.000","Ea","Tree Removed - Diameter 24 Inches And Over","104." "5.000","Ea","Stump Removed","105." "27500.000","Cy","Earth Excavation","120." "1000.000","Cy","Class a Rock Excavation","121." "550.000","Cy","Muck Excavation","123." "1120.000","Cy","Bridge Excavation","140." "9340.000","Cy","Class a Trench Excavation","141." "30.000","Cy","Test Pit For Exploration","141.1" "1250.000","Cy","Class b Trench Excavation","142." "750.000","Cy","Class b Rock Excavation","144." "42.000","Ea","Drainage Structure Removed","146." "640.000","Cy","Special Borrow","150.1" "16500.000","Cy","Gravel Borrow","151." "325.000","Cy","Gravel Borrow For Bridge Foundation","151.1" "5100.000","Cy","Gravel Borrow For Backfilling Structures And Pipes","151.2" "10.000","Cy","Sand Borrow","154." "1750.000","Ton","Crushed Stone","156." "100.000","Ton","Crushed Stone For Bridge Foundations","156.1" "56700.000","Sy","Fine Grading And Compacting - Subgrade Area","170." "1.000","Ls","Environmental Health And Safety Program","180.01" "400.000","Hr","Personal Protection Level c Upgrade","180.02" "400.000","Hr","Licensed Site Professional Services","180.03" "50.000","Ton","Disposal Of Unregulated Soil","181.11" "100.000","Ton","Disposal Of Regulated Soil - In-State Facility","181.12" "100.000","Ton","Disposal Of Regulated Soil - Out-Of-State Facility","181.13" "20.000","Ton","Disposal Of Hazardous Waste","181.14" "1.000","Ls","Asbestos Removal Permits","182.21" "760.000","Ft","Removal Of Asbestos Pipe","182.22" "5000.000","Gal","Treatment Of Contaminated Groundwater","183.1" "500.000","Lb","Disposal Of Granular Activated Carbon","183.2" "5.000","Ton","Disposal Of Treated Wood Products","184.1" "118.000","Ea","Special Catch Basin","201.3" "82.000","Ea","Manhole","202." "1.000","Ls","Special Manhole (10 Ft x 8 Ft)","202.11" "4.000","Ea","Manhole (9 To 14 Foot Depth)","202.2" "10.000","Ea","Manhole (5 Ft Diameter)","202.5" "6.000","Ea","Manhole (6 Ft Diameter)","202.6" "4.000","Ea","Manhole (8 Ft Diameter)","202.8" "17.000","Ea","Deep Sump Manhole","202.9" "17.000","Ea","Gutter Inlet - Special","204.11" "6.000","Ea","Leaching Basin","205." "2.000","Ea","Drop Inlet, Type Df","209.1" "10.000","Ea","Drainage Structure Adjusted","220." "6.000","Ea","Drainage Structure Change In Type","220.3" "3.000","Ea","Drainage Structure Remodeled","220.5" "35.000","Ea","Sanitary Structure Adjusted","220.7" "8.000","Ea","Sanitary Structure Remodeled","220.8" "137.000","Ea","Frame And Cover","221." "135.000","Ea","Frame And Grate - Massdot Cascade Type","222.1" "2.000","Ea","Frame And Grate - Massdot Drop Inlet","222.2" "41.000","Ea","Frame And Grate (Or Cover) Removed And Discarded","223.2" "135.000","Ea","12 Inch Hood","224.12" "60.000","Cy","Removal Of Drainage Structure Sediment","227.3" "720.000","Ft","Removal Of Drainage Pipe Sediment","227.31" "50.000","Ft","43 x 27 Inch Accm Pipe-Arch 12 Gage","232.4" "41.000","Ft","50 x 31 Inch Accm Pipe-Arch 12 Gage","232.5" "1200.000","Ft","12 Inch Ductile Iron Pipe","238.12" "10.000","Ft","16 Inch Ductile Iron Pipe","238.16" "130.000","Ft","24 Inch Ductile Iron Pipe","238.24" "2500.000","Ft","12 Inch Reinforced Concrete Pipe","241.12" "475.000","Ft","15 Inch Reinforced Concrete Pipe","241.15" "880.000","Ft","18 Inch Reinforced Concrete Pipe","241.18" "1000.000","Ft","24 Inch Reinforced Concrete Pipe","241.24" "1900.000","Ft","12 Inch Reinforced Concrete Pipe Class v","244.12" "500.000","Ft","15 Inch Reinforced Concrete Pipe Class v","244.15" "1750.000","Ft","18 Inch Reinforced Concrete Pipe Class v","244.18" "1170.000","Ft","24 Inch Reinforced Concrete Pipe Class v","244.24" "110.000","Sy","Stone For Pipe Ends","258." "360.000","Ft","6 Inch Ductile Iron Water Pipe (Mechanical Joint)","303.06" "10.000","Ft","8 Inch Ductile Iron Water Pipe (Mechanical Joint)","303.08" "420.000","Ft","12 Inch Ductile Iron Water Pipe (Mechanical Joint)","303.12" "1740.000","Lb","Ductile Iron Fittings For Water Pipe","309." "70.000","Ft","3/4 Inch Copper Tubing Type k","347.075" "70.000","Ft","1 Inch Copper Tubing Type k","347.1" "70.000","Ft","1-1/4 Inch Copper Tubing Type k","347.125" "70.000","Ft","1-1/2 Inch Copper Tubing Type k","347.15" "70.000","Ft","2 Inch Copper Tubing Type k","347.2" "1.000","Ea","12 Inch Gate Valve","349.12" "11.000","Ea","6 Inch Gate Box","357.06" "67.000","Ea","Gate Box Adjusted","358." "5.000","Ea","3/4 Inch Corporation Cock","363.075" "5.000","Ea","1 Inch Corporation Cock","363.1" "5.000","Ea","1-1/4 Inch Corporation Cock","363.125" "5.000","Ea","1-1/2 Inch Corporation Cock","363.15" "5.000","Ea","1-3/4 Inch Corporation Cock","363.175" "5.000","Ea","2 Inch Corporation Cock","363.2" "2.000","Ea","12 Inch Cast Iron Plug","367.12" "1.000","Ea","8 x 6 Inch Tapping Sleeve, Valve And Box","370.1" "4.000","Ea","6 Inch Coupling","371.06" "10.000","Ea","8 Inch Coupling","371.08" "10.000","Ea","12 Inch Coupling","371.12" "1325.000","Ft","Water Pipe Insulation Board","373." "1.000","Ea","8 Inch Insertion Valve And Box","375.08" "2.000","Ea","12 Inch Insertion Valve And Box","375.12" "13.000","Ea","Hydrant - Removed And Reset","376.2" "1.000","Ea","Hydrant - Adjusted","376.5" "9.000","Ea","Service Box","381." "44.000","Ea","Service Box Adjusted","381.3" "4800.000","Cy","Dense Graded Crushed Stone For Sub-Base","402." "2500.000","Sy","Pavement Micro Milling","415.3" "195000.000","Lb","Calcium Chloride For Roadway Dust Control","440." "220.000","Mgl","Water For Roadway Dust Control","443." "4550.000","Ton","Superpave Surface Course - 12.5 (Ssc - 12.5)","450.23" "6175.000","Ton","Superpave Intermediate Course - 19.0 (Sic - 19.0)","450.32" "11000.000","Ton","Superpave Base Course - 37.5 (Sbc - 37.5)","450.42" "115.000","Ton","Hma For Patching","451." "7500.000","Gal","Asphalt Emulsion For Tack Coat","452." "11000.000","Ft","Hma Joint Sealant","453." "1600.000","Ton","Asphalt Mixtures For Temporary Work","472." "140.000","Ft","Sawcutting Asphalt Pavement For Box Widening","482.5" "16250.000","Ft","Granite Curb Type Vb - Straight","506." "1200.000","Ft","Granite Curb Type Vb - Curved","506.1" "310.000","Ft","Type t100 Granite Curb","507." "1215.000","Ft","Granite Transition Curb For Wheelchair Ramps - Straight","509." "625.000","Ft","Granite Transition Curb For Wheelchair Ramps - Curved","509.1" "95.000","Ea","Granite Curb Inlet - Straight","514." "20.000","Ea","Granite Curb Inlet - Curved","515." "45.000","Ft","Timber Curb","531." "70.000","Ft","Curb Removed And Reset","580." "7200.000","Ft","Curb Removed And Discarded","594." "3565.000","Ft","Guardrail, Tl-2 (Single Faced)","620.12" "270.000","Ft","Guardrail - Curved, Tl-2 (Single Faced)","620.32" "12.000","Ea","Trailing Anchorage","627.1" "6.000","Ea","Guardrail Tangent End Treatment, Tl-2","627.82" "2.000","Ea","Guardrail Flared End Treatment, Tl-2","627.92" "75.000","Ft","Highway Guard Removed And Reset","630." "3000.000","Ft","Highway Guard Removed And Discarded","630.2" "875.000","Ft","Wood Rail Fence","655.3" "750.000","Ft","Fence Removed And Stacked","669." "182.000","Ea","Silt Sack","697.1" "1400.000","Sy","Geotextile Fabric For Separation","698.3" "7200.000","Sy","Cement Concrete Sidewalk","701." "1250.000","Sy","Cement Concrete Sidewalk At Driveways","701.1" "1000.000","Sy","Cement Concrete Wheelchair Ramp","701.2" "425.000","Sy","Stamped Cement Concrete Pavement","701.31" "900.000","Ton","Hot Mix Asphalt Walk Surface","702." "12750.000","Sf","Imprint Crosswalk System","703.9" "45.000","Sy","Gravel For Driveways","704.2" "1.000","Sy","Flagstone Walk Removed And Reset","705.1" "5.000","Ea","Bound Removed And Reset","711." "9.000","Ea","Bound Removed And Stacked","712." "18.000","Ea","Rural Mail Box Removed And Reset","715." "15.000","Ea","Boulders Removed And Reset","720." "38.000","Mo","Engineers Field Office And Equipment (Type a)","740." "1.000","Ls","Mobilization","748." "2125.000","Cy","Loam Borrow","751." "250.000","Cy","Planting Trench Soil","751.2" "935.000","Sy","Compost Topsoil","751.7" "1.000","Ls","Inland Wetland Replication Area","755.35" "40.000","Hr","Wetland Specialist","755.75" "1.000","Ls","Wetland Monitoring","755.76" "1.000","Ls","Npdes Stormwater Pollution Prevention Plan","756." "15300.000","Sy","Seeding","765." "935.000","Sy","Seeding-Mid-Height Upland Native Mix - Full Sun","765.422" "13300.000","Ft","Sediment Control Barrier","767.121" "10.000","Cy","Aged Pine Bark Mulch","767.6" "935.000","Sy","Composted Mulch Over Modified Rock","767.77" "3400.000","Sy","Matting For Erosion Control","767.9" "3800.000","Ft","Pavement Milling Mulch Under Guard Rail","769." "4.000","Ea","Elm - 'Princeton' 2-2.5 Inch Cal","775.027" "3.000","Ea","Hophornbeam - American 2-2.5 Inch Caliper","775.035" "10.000","Ea","Locust - Honey - 'Shademaster' 2-2.5 Inch Caliper","775.431" "5.000","Ea","Maple - Red - 'Armstrong' 2-2.5 Inch Caliper","776.523" "2.000","Ea","Maple – Red- ‘Karpick’ 2-2.5 Inch Cal","776.529" "3.000","Ea","Sweetgum-'Hapdell' 2-2.5 Inch Cal","777.679" "14.000","Ea","Gingko-Autumn Gold 2-2.5 Inch Cal","778.025" "3.000","Ea","Birch – River ‘Heritage’ Single Stem","778.167" "11.000","Ea","Crabapple-Adirondack 2.5-3 Inch Cal","778.409" "1.000","Ea","Dogwood-'Constellation' 1.5 Inch Cal","780.181" "9.000","Ea","Pear - Callery - 'Chanticleer' 2-2.5 Inch Caliper","782.423" "4.000","Ea","Holly - Japanese - 'Hetz' 24-30 Inch","785.587" "62.000","Ea","Juniper - Andorra 18-24 Inch","786.031" "18.000","Ea","Juniper-'Bar Harbor' 18-24 Inch Spread","786.083" "96.000","Ea","Juniper-'Blue Star' 12-18 Inch Spread","786.099" "9.000","Ea","Juniper-'Sea Green' 24-30 Inch Spread","786.473" "92.000","Ea","Sumac-Fragrant-'Gro-Low' 18-24 Inch Spread","794.337" "33.000","Ea","Sweetfern 2 Gallon","794.805" "124.000","Ea","Fountain Grass-'Karley Rose' 1 Gallon","796.433" "131.000","Ea","Switch Grass-Heavy Metal' 1 Gallon","796.457" "71.000","Ea","Switch Grass-'Shenendoah' 1 Gallon","796.459" "255.000","Ea","Catmint-'Walkers Low' 1 Gallon","796.727" "48.000","Ea","Daylilly-'Happy Returns' 1 Gallon","796.753" "90.000","Ea","Daylilly-'Purple Returns' 1 Gallon","796.757" "57.000","Ea","Daylilly-'Red Hot Returns' 1 Gallon","796.761" "13050.000","Ft","3 Inch Electrical Conduit Type Nm - Plastic -(Ul)","804.3" "104.000","Ea","Electric Handhole - (Municipal Standard)","811.27" "35.000","Ea","Pull Box 12 x 12 Inches - Sd2.031","811.31" "82.000","Ea","Light Foundation - Concrete","812.16" "17.000","Ea","Deep Light Foundation - Concrete","812.17" "2.000","Ea","Lighting Load Center Foundation","812.20" "45500.000","Ft","Wire Type 7 No. 10 General Purpose","813.30" "16500.000","Ft","Wire Type 7 No. 4 General Purpose","813.33" "86900.000","Ft","Wire Type 7 No. 2 General Purpose","813.34" "600.000","Ft","Wire Type 7 No. 1 General Purpose","813.35" "99.000","Ea","Splice And Extension From Handhole To Lighting Fixtures","813.399" "1.000","Ls","Service Connection (Underground)","813.81" "1.000","Ls","Traffic Control Signal Location No. 1","815.1" "1.000","Ls","Traffic Control Signal Location No. 2","815.2" "1.000","Ls","Traffic Control Signal Location No. 3","815.3" "1.000","Ls","Traffic Control Signal Removed And Stacked","816.80" "1.000","Ls","Traffic Control Signal Removed And Stacked","816.801" "71.000","Ea","Light Pole And Single Pendant Luminaire w/ 8' Arm And Banner Arm","821.50" "13.000","Ea","Light Pole And Single Pendant Luminaire w/ 12' Arm And Banner Arm","821.51" "11.000","Ea","Light Pole Arm And Single Pendant Luminaire w/ 4' Arm And Banner Arm","821.52" "4.000","Ea","Light Pole And Double Pendant Luminaire And Banner Arm","821.53" "1.000","Ls","Highway Lighting Load Center No.1","823.61" "1.000","Ls","Highway Lighting Load Center No.2","823.62" "1.000","Ls","Rectangular Rapid Flashing Beacon (Ac Powered)","824.211" "1.000","Ls","Rectangular Rapid Flashing Beacon (Solar), Loc. No. 1","824.221" "1.000","Ls","Rectangular Rapid Flashing Beacon (Solar), Loc. No. 2","824.222" "1.000","Ls","Rectangular Rapid Flashing Beacon (Solar), Loc. No. 3","824.223" "1.000","Ls","Rectangular Rapid Flashing Beacon (Solar), Loc. No. 4","824.224" "1.000","Ls","Rectangular Rapid Flashing Beacon (Solar), Loc. No. 5","824.225" "1.000","Ls","Rectangular Rapid Flashing Beacon (Solar), Loc. No. 6","824.226" "1.000","Ls","Rectangular Rapid Flashing Beacon (Solar), Loc. No. 7","824.227" "640.000","Sf","Warning-Regulatory And Route Marker - Aluminum Panel (Type a)","832." "90.000","Ea","Demountable Reflectorized Delineator - Guard Rail","833.5" "21.000","Ea","Delineation For Guard Rail Termini","833.7" "103.000","Ea","Sign Sup (n/Guide)+Rte Mkr w/1 Brkway Post Assembly - Steel","847.1" "840.000","Hr","Roadway Flagger","850.41" "510.000","Day","Traffic Cones For Traffic Management","851.1" "866.000","Sf","Safety Signing For Traffic Management","852." "1500.000","Ft","Temporary Pedestrian Barricade","852.11" "16.000","Ea","Temporary Pedestrian Curb Ramp","852.12" "10.000","Ea","Portable Breakaway Barricade Type Iii","853.1" "930.000","Ft","Temporary Barrier (Tl-2)","853.2" "3500.000","Ft","Temporary Barrier Removed And Reset","853.21" "9.000","Ea","Temporary Impact Attenuator Removed And Reset","853.501" "6.000","Ea","Temporary Impact Attenuator Unidirectional, Redirective (Tl-3)","853.63" "80.000","Day","Temporary Illumination For Work Zone","853.8" "53650.000","Ft","Temporary Paving Markings - 6 Inch (Painted)","854.016" "4000.000","Sf","Pavement Marking Removal","854.1" "1600.000","Day","Arrow Board","856." "3100.000","Day","Portable Changeable Message Sign","856.12" "48000.000","Day","Reflectorized Drum","859." "2065.000","Sf","Pavement Arrows And Legends Reflectorized White (Thermoplastic)","864.04" "40.000","Ea","Slotted Pavement Marker Two-Way Yellow/Yellow","864.35" "22000.000","Ft","6 Inch Reflectorized White Line (Thermoplastic)","866.106" "4000.000","Ft","12 Inch Reflectorized White Line (Thermoplastic)","866.112" "27000.000","Ft","6 Inch Reflectorized Yellow Line (Thermoplastic)","867.106" "4500.000","Ft","12 Inch Reflectorized Yellow Line (Thermoplastic)","867.112" "8.000","Ea","Street Name Sign","874." "4.000","Ea","Street Sign Removed And Reset","874.1" "9.000","Ea","Traffic Sign Removed And Reset","874.2" "45.000","Ea","Traffic Sign Removed And Discarded","874.41" "15.000","Cy","4000 Psi, 1.5 Inch, 565 Cement Concrete","901." "10.000","Cy","3000 Psi, 1.5 Inch, 470 Cement Concrete","903." "250.000","Lb","Steel Reinforcement For Structures","910." "2.000","Ea","30 Inch Utility Pole Caisson","945.011" "55.000","Ft","Drilled Shaft Excavation 3.5 Foot Diameter","945.102" "15.000","Ft","Rock Socket Excavation 3.5 Foot Diameter","945.202" "60.000","Ft","Drilled Shaft 3.5 Foot Diameter","945.502" "1.000","Ls","Excavation Support System Special Drainage Structure No. 1","953.31" "1.000","Ls","Excavation Support System Special Drainage Structure No. 2","953.32" "1.000","Ls","Excavation Support System Special Drainage Structure No. 3","953.33" "1.000","Ls","Excavation Support System Special Drainage Structure No. 4","953.34" "70.000","Ton","Riprap","983.1" "935.000","Sy","Modified Rockfill","986.1" "1.000","Ls","Control Of Water - Special Drainage Structure No. 1","991.11" "1.000","Ls","Control Of Water - Special Drainage Structure No. 2","991.12" "1.000","Ls","Control Of Water - Special Drainage Structure No. 3","991.13" "1.000","Ls","Control Of Water - Special Drainage Structure No. 4","991.14" "1.000","Ls","Coordination And Support Of Gas Mains At Culverts","992.33" "1.000","Ls","Wall Structure, Wall No. 1","996.01" "1.000","Ls","Wall Structure, Wall No. 2","996.02" "1.000","Ls","Special Drainage Structure No. 1","997.1" "1.000","Ls","Special Drainage Structure No. 2","997.2" "1.000","Ls","Special Drainage Structure No. 3","997.3" "1.000","Ls","Special Drainage Structure No. 4","997.4"

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents