Similar Projects
23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Bidding

Dirt and Gravel Roads Howard Hill Road Project
Infrastructure
Bidding
Hallstead, PA 18822

Paving Project
Infrastructure
Post-Bid
Clifford, PA

Susquehanna County Pavement Improvements Project
Infrastructure
Post-Bid
Montrose, PA 18801

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Dirt and Gravel Petersen Road
Results
Dimock, PA 18801

Pothole Patching
Infrastructure
Post-Bid
Union Dale, PA 18470

2021 Road Improvement Project
Results

Truing and Leveling
Infrastructure
Post-Bid
Little Meadows, PA 18830

Dirt and Gravel Roads Grant Project on Cabin Hill Road
Results
Less than $98,000 est. value
Montrose, PA

Tar and Chip of Mausoleum Road
Infrastructure
Post-Bid
Union Dale, PA 18470

I-81 NB/SB Mill/Fill N Susq
Results
$2,500,000 to $4,999,999 est. value
PA

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Superpave
Results
Montrose, PA 18801

Micro-Surfacing
Results
Montrose, PA

Reported 03/09/2022 12:00 AM
Project Title

2022 Spring Road Maintenance

Physical Address View project details and contacts
City, State (County) Clifford, PA   (Susquehanna County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Road surface to 1 inch minimum below the bottom of deepest pot holes. Grader makes first pass along ditch line (both sides), bringing suitable material toward center of roadway. Grader will cut entire width of roadway in areas of the ruts and potholes. Distribute loose material over the width of roadway, maintain desired crown of 3/4" per foot. Entire width of roadway disturbed by grading shall be compacted with a vibratory roller prior to completion of the days activities. Trucking of 2A material from local state approved plant according to pa dot pub. 408 specs. Al work to be completed by July 4th in the award year. TWP. Reserves right to review all records relating to labor & equipment utilized in this contract.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents