Similar Projects
Kwik Trip / Reedsburg
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Reedsburg, WI 53959

Oneida - Green Bay
Demolition, New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Rock Springs, WI 53961

Wisconsin Dells - Baraboo Re - Ops for 6145-01-72
Infrastructure
Design
$250,000 to $500,000 est. value
Baraboo, WI

J's Pub and Grill - Outside Addition
Addition, Renovation, Infrastructure
Design
$100,000 CJ est. value
Reedsburg, WI 53959

Tomah - Portage; Mirror Lake Bridge
Infrastructure
Bidding
$8,000,000 CJ est. value
Rock Springs, WI 53961

Tomah - Portage; Mirror Lake Bridge
Infrastructure
Bidding
$8,000,000 CJ est. value
Rock Springs, WI 53961

Road Bids - 2022
Infrastructure
Post-Bid
$100,000 est. value
Baraboo, WI

Paving Work on 26th Avenue (Swamp Road)
Infrastructure
Post-Bid
$80,000 est. value

Maple Street Reconstruction Project
Infrastructure
Results
West Baraboo, WI

Maple Street Reconstruction Project
Infrastructure
Results
West Baraboo, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Pelton Apartments
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Reedsburg, WI 53959

Baraboo VA Outpatient Clinic
New Construction, Infrastructure - 11,300 SF
Pending Verification
$7,000,000 CJ est. value
Baraboo, WI 53913

Ironton - Woodland (CTH G) Constr OPS / Pavement Replacement
Infrastructure
Design
$3,000,000 CJ est. value
Ironton, WI 53941

Last Updated 10/11/2023 01:03 AM
Project Title

Mineral Point - Spring Green

Physical Address View project details and contacts
City, State (County) Loganville, WI 53943   (Sauk County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

20231114001. 5255-01-73 WISC 2024002 Mineral Point - Spring Green; Wisconsin River Bridge to USH 14, STH 023 Sauk County Estimate Anticipated Funding $2,000,000 - $2,999,999 Work Summary: Excavation, Base, Concrete Pavement, HMA Pavement, Culvert Pipe, Curb and Gutter, Sidewalk, Signs, Pavement Marking. Work Type: AD DBE Goal: 3% Guaranty Required: $ 75,000 With each sealed proposal, the bidder must include a properly executed bid bond or a cashiers check, certified check, bank's check, or postal money order in the amount designated on the Highway Work Proposal made payable to the Department. Certified checks shall be drawn on the account of the bidder submitting the proposal. Completion Date Contract: August 02, 2024 WI DOT - 005 - Mineral Point - Spring Green *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents