Similar Projects
New Elementary School - 2022 Bond - Harrisburg School District
New Construction, Infrastructure
Conception
$20,000,000 CJ est. value
Harrisburg, SD 57032

South Middle School - 2022 Bond - Harrisburg School District
Renovation, Infrastructure
Conception
$10,000,000 CJ est. value
Harrisburg, SD 57032

Median Lighting
Infrastructure
Design
$3,100,000 CJ est. value
Sioux Falls, SD 57108

Structure's and Approach Grading
Infrastructure
Design
$445,000 CJ est. value
Sioux Falls, SD 57108

Municipal Swimming Pool - City Of Canton REBID
Renovation, Infrastructure
Bidding
$7,215,000 CJ est. value
Canton, SD 57013

Stencil Group Site Improvements
Alteration
Post-Bid
Sioux Falls, SD

Dairy Queen Grill & Chill / Tea
New Construction, Infrastructure - 3,113 SF
Post-Bid
$950,000 CJ est. value
Tea, SD 57064

Regionalization Wastewater Pump Station and Forcemain
Renovation, Infrastructure
Results
$9,200,000 est. value
Tea, SD

Highway 18 Pipeline Relocation Project Schedule 1: Pipeline
Infrastructure
Results
$1,507,000 CJ est. value
Canton, SD 57013

High School Expansion - 2022 Bond - Tea Area School District
Addition, Demolition, New Construction, Renovation, Infrastructure
Construction
$39,000,000 CJ est. value
Tea, SD 57064

Pinnacle Estates Addition
New Construction, Infrastructure
Construction
$4,000,000 CJ est. value
Tea, SD 57064

Sioux Falls Canaries "Bird Cage "Stadium
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Sioux Falls, SD 57108

Josmer West Industrial Facility
New Construction, Infrastructure - 11,999 SF
Pending Verification
$6,500,000 CJ est. value
Tea, SD 57064

Legacy Band/ Vocal Room Addition Tea Area School District 41-5 Tea, South Dakota
Addition, Demolition, Infrastructure - 67,940 SF
Post-Bid
$37,911 CJ est. value
Tea, SD 57064

BRF 6378(00)22-1, PCN 08XA
Infrastructure
Results
$1,120,126 CJ est. value
Harrisburg, SD 57032

Last Updated 06/01/2023 01:04 AM
Project Title

Lewis & Clark Regional Water System - Larchwood Pump Station/ Upgrades to Dove Avenue Meter Building

Physical Address View project details and contacts
City, State (County) Tea, SD 57064   (Lincoln County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $4,700,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Larchwood Pump Station. New pump station located west and south of the intersection of 100th St and Arthur Ave. Outside dimensions are 38'x74'. Upgrades to Dove Avenue Meter Building. Existing meter building located at the 100th Street and Dove Avenue to add a pump, VFD, and appurtenances for Rock Rapids, IA. The work includes all piping, fittings, pumps, motors, VFDs, meters, gauges, valves, and appurtenances including but not limited to isolation valves, control valves, combination air valves, check valves, chemical feed and storage systems and telemetry & control systems as required at each location. The work includes all electrical and mechanical equipment and systems, including a generator at Larchwood. Site work includes, but is not limited to: Excavation, fill, grading, lighting, utilities, access road construction, parking area, fencing and site topsoiling, seeding and restoration. PVC site piping connections on inlet and outlet sides of the new building including corrosion protection (galvanic anodes). Sanitary sewer piping and connections to septic systems Substantial Completion04/18/2025Final Completion05/30/2025 Probable Cost 1$4,500,000 to $4,700,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.