Similar Projects
Murray Creek Residential
New Construction
Conception
Johns Island, SC 29455

Woodale
New Construction
Conception
Johns Island, SC 29455

Long Savannah - Master Plan
New Construction
Design
Charleston, SC

Wando Village
New Construction
Design
Charleston, SC 29492

Construction Repair Services
New Construction
Bidding
Charleston, SC 29403

Bathroom Modification
Renovation
Post-Bid
Less than $20,000 est. value
Summerville, SC

T. Ravenell Bathroom Modification
Renovation
Post-Bid
Less than $20,000 est. value
Cross, SC

Colin Mck Grant Home Renovations 587 and 589 Meeting Street
Renovation
Results
Less than $600,000 est. value
Charleston, SC 29401

Units F and G Fire Damage Repair Project
Results
Charleston, SC 29401

Ocean Course Cottages
New Construction - 56,000 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Kiawah Island, SC 29455

Single Family Birdie Garrett
New Construction
Construction
Charleston, SC 29405

Gaillard Road Residential
New Construction
Conception
SC 29461

Riverland Oaks
New Construction
Design
James Island, SC

Rehabilitation of Three (3) Residential Homes
Renovation
Post-Bid
North Charleston, SC

General Contract for 24 Engel Street Renovations
Renovation
Results
Less than $159,777 est. value
Charleston, SC 29403

Reported 07/22/2020 03:11 PM
Project Title

Daniel Island Park Island Homes

Physical Address View project details and contacts
City, State (County) Daniel Island, SC (Berkeley, Charleston Counties)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method
Project Status Construction Commenced January 2020
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

62 Single-Family Homes, New Construction, 80 Acres.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents