Similar Projects
FMC Chiller Replacement Zone A and B
Alteration
Bidding
$392,439 est. value
Columbus, OH 43223

SWWTP Boiler System Operational Improvements
Alteration
Bidding
Lockbourne, OH 43137

Central Safety Building HVAC System Reno
Post-Bid
Columbus, OH

CSCC Building Systems Upgrades - Nestor Boiler Replacements
Post-Bid
Less than $525,000 est. value
Columbus, OH 43215

SWWTP Sludge Dewatering Building HVAC Replacement
Results
Columbus, OH

HVAC and Interior Improvement, Package No.III - Brookhaven and Dominion
Results
$14,000,000 to $15,000,000 est. value
Columbus, OH

CSC-21501 Maintenance of HVAC, Plumbing and Emergency Power Supply (EPS) Systems
Term Contract
Bidding
Whitehall, OH 43213

Replacement of Central Enrollment's 40 Ton Condensing Unit and Evaporator
Post-Bid
Columbus, OH 43211

Gahanna Jefferson Public School District HVAC Upgrade Project
Results
Less than $1,335,293 est. value
Gahanna, OH

Multiple Building Chiller Replacements
Post-Bid
Less than $1,200,000 est. value
Columbus, OH

SWWTP East Aeration Control HVAC
Results
Columbus, OH

Eastland Fairfield Career Center - EFCC 2020 Improvements
Post-Bid
Less than $195,000 est. value
Groveport, OH 43125

HVAC Unit Replacement at Mark Twain Elementary School
Results
Less than $684,200 est. value
Westerville, OH

MERV Filters for CML HVAC Equipment
Post-Bid
Columbus, OH 43215

SWWTP ERC FRC HVAC Replacement
Results
Columbus, OH

Last Updated 08/12/2021 03:30 PM
Project Title

Northland High School 25 Ton AC Replacement for AHU 14

Physical Address View project details and contacts
City, State (County) Columbus, OH 43229   (Franklin County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will include the removal and disposal of the existing Lineset and 25 ton Trane Condenser Sn: 4C218 and AHU 14 Evaporator Coil. Replace existing DX system with new energy efficient model, matched Evaporator coil, refrigerant piping and Thermostatic Expansion Valve. Lockout/tag out Recover existing refrigerant-22, Disconnect electric from condensing unit Remove existing piping Remove existing coil from air handler Provide and install new coil in air handler with ductwork modifications as required. Use crane to remove existing condensing unit and install new. Install new R-410 evaporator coil in AHU 14, Provide and install all new inter-connecting piping between condenser and evaporator coil Reconnect electric to condensing unit with Pressure test piping Evacuate and charge unit Remove lockout/tag out Start unit and check operation.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents