Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Upgrade Electrical System Area 2
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Milwaukee, WI

Cooling Tower System Replacement - Central Services
Alteration
Bidding
Milwaukee, WI 53208

Four-Year HVAC Maintenance Services
Term Contract
Bidding
Milwaukee, WI 53204

J059--Light Poles Removal/Replacement ONE TIME BUY
Post-Bid
Milwaukee, WI

Wauwatosa City Hall Solar Photovoltaic System
Post-Bid
Wauwatosa, WI 53213

Zeidler Municipal Building, 2nd Floor, Health Lab HVAC Upgrades
Results
Milwaukee, WI 53202

GMIA Electrical Switchgear Replacement
Results
Milwaukee, WI

MacDowell Montessori Auditorium Lighting Upgrade - DIV 1
Alteration
Bidding
Milwaukee, WI 53213

KK Tank House Electrical Upgrade
Term Contract
Post-Bid
Milwaukee, WI 53204

Unit Heater Replacement
Results
Milwaukee, WI 53216

Milwaukee French Immersion Auditorium Lighting Upgrade - Division 1
Alteration
Bidding
Milwaukee, WI 53218

Channel Letter Signs
Renovation
Post-Bid
$10,000 est. value
West Allis, WI

Preliminary Treatment Facility Electrical Upgrade
Results
Milwaukee, WI 53207

Energy Rater Services for Building 3.4 (Westlawn Renaissance VII) at Westlawn Gardens Phase 2
Alteration
Bidding
Milwaukee, WI 53218

Last Updated 03/28/2022 10:59 AM
Project Title

Ventilation Improvements GPC

Physical Address View project details and contacts
City, State (County) Milwaukee, WI 53233   (Milwaukee County)
Category(s) Single Trades
Sub-Category(s) Electric, HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $9,422,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Address conditions within the MSDF facility that have contributed to identified ventilation deficiencies and heat stress related issues for inmates and staff by expanding, enhancing, and unifying the existing ventilation equipment throughout the facility. Project includes air handling replacements and modifications. The air handling unit modifications include installation of chilled water coils and upgrading air filters in existing units. The chilled water system modifications and additions include installing new air cooled chillers, upgrading obsolete chilled water units and eliminating some less efficient direct expansion cooling units. The HVAC controls are being upgraded with new direct digital controls and upgrading pneumatic controlled devices to operate on direct digital electronic controls. Electrical additions and enhancements are required to support the new HVAC equipment

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents