Similar Projects
HVAC Water Treatment Chemicals, Service and Testing
Term Contract
Post-Bid
Cranston, RI

RISE Prep Mayoral Academy HVAC Maintenance Services
Post-Bid
Woonsocket, RI 02895

Dust Collection System
Results
Providence, RI

Powers Building - HVAC Terminal Box Control Upgrade Phase II
Results
North Providence, RI 02908

HVAC Maintenance Service
Post-Bid
North Providence, RI 02908

Police Station HVAC
Results
North Scituate, RI

HVAC Preventative Maintenance Program
Term Contract
Post-Bid
Central Falls, RI 02863

S114--Contract for Boilers and Cooling Towers Treatment
Results
Providence, RI 02908

Air Handler and Air Duct Cleaning
Post-Bid
Cranston, RI 02920

Second Floor Town Hall Air Conditioning
Results
North Scituate, RI 02857

Auditorium Condensing Unit Replacement
Post-Bid
North Scituate, RI 02857

Lincoln Rescue Station Front Street Heating Replacement
Results
Lincoln, RI 02865

Installation 2.5 Tom Mitsubishi A/C Split Replacement
Post-Bid
Cranston, RI 02920

Replacement of Air Control System for Police Station
Results
East Providence, RI 02914

Generator Exhaust Stack
Post-Bid
$500,000 to $1,000,000 est. value
Providence, RI 02903

Reported 04/17/2021 12:00 AM
Project Title

Elevator Ventilation Improvements City Hall

Physical Address View project details and contacts
City, State (County) Central Falls, RI 02863   (Providence County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall include, but not be limited to, the following: 1. Divide the air plenum to serve the boiler and elevator rooms separately. 2. Provide and install a damper in the elevator machinery room section of the plenum. 3. Provide and install a damper in the elevator room dedicated duct. 4. Provide and install damper controls with a reverse acting thermostat. 5. Provide and install all necessary electrical wiring, controls, disconnects and breakers necessary to power the two new motorized dampers and controls. 6. Seal the ductwork where the PVC vent exits the ductwork in the crawl space.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents