Similar Projects
Reported | 04/17/2021 12:00 AM |
Project Title | Elevator Ventilation Improvements City Hall |
Physical Address | View project details and contacts |
City, State (County) | Central Falls, RI 02863 (Providence County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work shall include, but not be limited to, the following: 1. Divide the air plenum to serve the boiler and elevator rooms separately. 2. Provide and install a damper in the elevator machinery room section of the plenum. 3. Provide and install a damper in the elevator room dedicated duct. 4. Provide and install damper controls with a reverse acting thermostat. 5. Provide and install all necessary electrical wiring, controls, disconnects and breakers necessary to power the two new motorized dampers and controls. 6. Seal the ductwork where the PVC vent exits the ductwork in the crawl space. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |