Project Title

Contract 1 Antworth Lane Water Main

Physical Address View project details and contacts
City, State (County) Mars Hill, ME   (Aroostook County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $175,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The installation of approximately 2,000 feet of new ductile iron water main from existing 8-inch main on Route 1 and along Antworth Lane to the proposed Water Treatment Plant Site in Mars Hill, Maine. The new main will be 8 and 12-inch ductile iron pipe, along with associated valves, and hydrants. The project will also involve the installation of a new 6-inch water main (approx. 1,100 feet), along with all associated valves, hydrants, and fittings from Wells TW-1, TW-3, TW-3A to the proposed Water Treatment Plant Site as detailed by the project limits in the plans. The Contractor shall install materials pre-purchased by the Owner. Owner has pre-purchased water main pipe and fittings, hydrant assemblies, valves, valve and service boxes, polywrap, brass wedges, and pipe adapters, which are stored on District property at the project location.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts