Similar Projects
Last Updated | 06/07/2021 11:51 AM |
Project Title | Contract 1 Antworth Lane Water Main |
Physical Address | View project details and contacts |
City, State (County) | Mars Hill, ME (Aroostook County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $175,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The installation of approximately 2,000 feet of new ductile iron water main from existing 8-inch main on Route 1 and along Antworth Lane to the proposed Water Treatment Plant Site in Mars Hill, Maine. The new main will be 8 and 12-inch ductile iron pipe, along with associated valves, and hydrants. The project will also involve the installation of a new 6-inch water main (approx. 1,100 feet), along with all associated valves, hydrants, and fittings from Wells TW-1, TW-3, TW-3A to the proposed Water Treatment Plant Site as detailed by the project limits in the plans. The Contractor shall install materials pre-purchased by the Owner. Owner has pre-purchased water main pipe and fittings, hydrant assemblies, valves, valve and service boxes, polywrap, brass wedges, and pipe adapters, which are stored on District property at the project location. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |