Similar Projects
Plumbing Maintenance and Repair Services at Norfolk Naval Shipyard, Portsmouth, Virginia AOR
Term Contract, Alteration
Design
Less than $800,000 est. value
Portsmouth, VA 23709

Installation of III-B Well and Abandoned Existing Drilled Well
Infrastructure
Bidding
$9,000 est. value
Amelia Court House, VA 23002

Well Replacement and Abandonment
Alteration
Bidding
$450,000 est. value
Amelia Court House, VA 23002

Scroll Vacuum Pump
Post-Bid
Norfolk, VA

Pump Maintenance, Repair Services, Parts and Equipment
Post-Bid
Norfolk, VA

Self Priming Water Pump
Results
Staunton, VA 24401

Manhole and Wet Well Rehabilitation and Related Services
Term Contract
Results
VA

Construct a Private Water Well
Infrastructure
Bidding
$550,000 est. value
Drakes Branch, VA 23937

Construction of Town Center Fountains Pump Replacement
Post-Bid
Virginia Beach, VA

Sanitary Pump Installation
Results
Suffolk, VA

Installation of III-A Well and Abandoned Existing Bored Well
Infrastructure
Bidding
$40,000 est. value
Smithfield, VA 23430

Water Pump Test Stand HMI Installation & Configuration
Post-Bid
Portsmouth, VA 23709

Replacement Pump for VIC Thomas Hatchery
Results
Brookneal, Marion, VA 24528

Construct a Private Water Well
Infrastructure
Bidding
$200,000 est. value
Manakin, VA 23103

Manassas Water Treatment Plant Clearwell No 2
Infrastructure
Post-Bid
Nokesville, VA 20181

Reported 05/27/2022 12:00 AM
Project Title

Installing, Developing, Testing, Rehabilitation Abandoning Production and Monitoring Wells

Physical Address View project details and contacts
City, State (County) Chesapeake, VA   (Chesapeake City County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work under this Project consists of drilling, installing, developing and completing pumping tests at a new production well, rehabilitating existing production wells using aggressive mechanical and pumping techniques, and abandoning any production or monitoring wells as needed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents