Similar Projects
Artificial Turf and Track Surface Improvements
Results
Scarborough, ME

Main Street Parks Project
Results
Madawaska, ME

Eastern Promenade and Lyman Moore School Tennis and Basketball Court Resurfacing
Results
Less than $50,000 est. value
Portland, ME

General Contractor Veteran's Plaza Project
Results
Brunswick, ME

Skate Park Design and Installation
Results
Less than $125,000 est. value
Bangor, ME 04401

Kate Furbish Elementary School Playground
Results
Brunswick, ME

Track Replacement
Results
Skowhegan, ME

Installation of a Futsal Court
Results
Less than $110,000 est. value
Portland, ME

York High School Tennis Courts Demolition and Reconstruction
Bidding
York, ME

Play Structure Replacement - Chapin and Hayford Parks
Results
Less than $225,000 est. value
Bangor, ME 04401

Community Park - Phase 2
Results
Windham, ME 04062

Tennis Court Repairs
Results
Lewiston, ME 04240

Restoration of Atlantic Avenue Park
Results
Old Orchard Beach, ME

Construction of Concrete Skatepark
New Construction - 10,000 SF
Results
South Portland, ME

Last Updated 04/24/2020 10:48 AM
Project Title

Redbank Village Field Improvements

Physical Address View project details and contacts
City, State (County) South Portland, ME   (Cumberland County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $75,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes construction of a regraded recreational field in Redbank Village on MacArthur Circle in South Portland. The scope of the work will consist of the re-grading of the land to be used for a ball field and seasonal skating rink, furnishing and installing fill soil, loam and seed and the construction and rehabilitation of the existing gravel paths. The work will include installing a new 1-1/2” water service connection meter pit and meter and yard hydrants for community gardens and rink flooding water. The work includes designing, furnishing and installing a sprinkler irrigation system of the regraded field area including all plumbing and electrical work.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents