Similar Projects
Twin Valley Road Improvements
Infrastructure
Bidding

Rhinelander - Monico, CTH P - USH 45 North
Infrastructure
Bidding
WI

Chip Seal, Fog Seal, GSB-88 and Prep Work 2021 Road Maintenance
Post-Bid
Rhinelander, WI

Bolger Lake Road Work
Infrastructure
Post-Bid
Minocqua, WI 54548

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Rhinelander-Oneida County Airport
Infrastructure
Post-Bid
Rhinelander, WI

Hancock Oneida Road Reconstruction
Results
WI

Paving Approximately 5 Miles of Roads
Results
Hazelhurst, WI

2021 Road Improvements
Results
Three Lakes, WI

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

2021 Monico Street Improvements
Results
Rhinelander, WI 54501

Minocqua - Manitowish, Woodland Drive - CTH M
Results
Manitowish, Minocqua, WI 54545

Fifield - Woodruff, Morgan Road - USH 51
Results
Fifield, Woodruff, WI 54548

Monico - Laona, USH 45 North to Forest County Line
Infrastructure
Results
Laona, Monico, WI

Last Updated 03/14/2022 01:12 AM
Project Title

Rhinelander - Woodruff, Kildeer Road - Vilas County Line

Physical Address View project details and contacts
City, State (County) WI   (Oneida County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Oneida County; 9050-03-71; STH 47; 11.940 Miles; Grading, Base, Milling, Asphalt Pavement, Culvert Pipe, Storm Sewer, Curb and Gutter, Sidewalk, Guardrail, Pavement Markings, and Signs Excavation Common, 1,200 CY; Base Aggregate Dense, 13,423 Ton; Marking Epoxy, 158,827 LF; Construction Staking, 64,101 LF; Construction Staking, 98 Each; Construction Staking, 2 LS; Conduit, 1,406 LF; Culvert Pipe, 77 LF 24”, 86 LF 30” Storm Sewer Pipe, 93 LF 12”, 369 LF 18”, 4 LF 24”, 6 LF 30”; Concrete Curb, 73 LF; Concrete Curb and Gutter, 15,809 LF; Concrete Sidewalk, 6,936 SF; Beam Guard, 1,788 LF; Beam Guard Energy Absorbing Terminals, 8 Each; Asphaltic Surface, 2,338 Ton; HMA Pavement, 27,700 Ton; Removing Asphaltic Surface Milling, 239,419 SY; Tack Coat, 15,661 Gals; Signs, 45 SF; Culvert Pipe Liner, 85 LF

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents