Similar Projects
Sixth Street, Maine Street to Hampshire Street - 20716 - City of Quincy
Infrastructure
Conception
$710,000 CJ est. value
Quincy, IL 62301

Sixth Street, Maine Street to Hampshire Street - 20716 - City of Quincy
Infrastructure
Conception
$710,000 CJ est. value
Quincy, IL 62301

Sixth Street, Hampshire To Vermont Streets - 15709 - City of Quincy
Infrastructure
Design
$4,270,000 CJ est. value
Quincy, IL 62301

Sixth Street, Hampshire To Vermont Streets - 15709 - City of Quincy
Infrastructure
Design
$4,270,000 CJ est. value
Quincy, IL 62301

Water Treatment Plant (WTP) Low Voltage MCC Modification Project
Renovation
Bidding
$300,000 CJ est. value
Quincy, IL 62301

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Water Main Improvements
Infrastructure
Post-Bid

Payson Avenue Roadway, Water Main, and Sewer Improvements
Results
Less than $1,593,623 est. value
Quincy, IL 62328

Harrison to Van Buren Roadway, Water Main, and Sewer Improvements
Results
Less than $1,788,247 est. value
Quincy, IL 62301

Concrete Replacement Work at Indian Hills (IL 16-1)
Infrastructure
Post-Bid
$130,000 CJ est. value
Quincy, IL 62301

Sewer and Water Main Replacement - Oak Street North 5th to North 8th Street
Infrastructure
Results
Less than $1,900,984 est. value
Quincy, IL 62301

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

Elm Street - North 6th to North 7th Roadway, Water Main, and Sewer Improvements
Infrastructure
Results
$815,754 est. value
Quincy, IL 62301

RFQ - Various Phase III Construction Inspection Projects, Various Routes, Various Counties
Term Contract
Post-Bid
Schaumburg, IL 60194

Monroe Street - South 16th to South 18th
Infrastructure
Results
$886,376 est. value
Quincy, IL

Last Updated 09/21/2022 12:03 AM
Project Title

Construction of Phase II LTCP Maximization Project

Physical Address View project details and contacts
City, State (County) Quincy, IL 62301   (Adams County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of structural, mechanical and electrical improvements to increase the capacity of the Quincy Wastewater Treatment Facility and reduce the volume of combined sewer overflows, including construction of new reinforced concrete structures and modification and rehabilitation of existing structures; refurbishing six (6) mixed-flow non-clog pumps; furnishing and installing three (3) Archimedes screw pumps, backflow prevention devices, CSO screening devices, electrical switchgear and electrical control systems, and appurtenances; construction of buried water mains and sewer piping; construction of pavements; and associated work. "Any contract or contracts awarded under this invitation for bids are expected to be funded in part by a loan from the Illinois Environmental Protection Agency (Illinois EPA). Neither the State of Illinois nor any of its departments, agencies, or employees is or will be a party to this invitation for bids or any resulting contract. The procurement will be subject to regulations contained in the Procedures for Issuing Loans from the Water Pollution Control Loan Program (35 IAC Part 365), the Davis-Bacon Act (40 USC 276a through 276a-5) as defined by the United States Department of Labor, the Employment of Illinois Workers on Public Works Act (30 ILCS 570), Illinois Works Jobs Program Act (30 ILCS 559/20-1), and the federal "Build America, Buy America Act" requirements contained in the Infrastructure Investment and Jobs Act, Pub. L. No. 117-58. This procurement is also subject to the loan recipient's policy regarding the increased use of disadvantaged business enterprises. The loan recipient's policy requires all bidders to undertake specified affirmative efforts at least sixteen (16) days prior to bid opening. The policy is contained in the specifications. Bidders are also required to comply with the President's Executive Order No. 11246, as amended.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents