Last Updated | 03/15/2023 06:06 PM |
Project Title | UG Distribution Line Service - Detroit to Idanha |
Physical Address | View project details and contacts |
City, State (County) | Detroit, OR 97342 (Marion County) |
Category(s) | Heavy and Highway, Outdoor Lighting |
Sub-Category(s) | Roadway Lighting, Site Development |
Contracting Method | Bids by Invitation |
Project Status | Bidding, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 [brand] Estimate |
Plans Available from | Owner's Representative |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | There are 2 projects that will be bid separately. They are both along Highway 22 near Detroit, OR. One project is installing a new UG distribution line service along Highway 22 from just west of the Detroit Ranger Station to the west end of the Highway 22 Bridge. The scope of the work includes trenching/boring and installing conduit, sleeves, and pedestals for 2 3-phase underground circuits. There will also be a few 1-phase taps. The material includes 6 1-phase pad-mount transformer sleeves, 3 1- phase junction box sleeves, and 14 3-phase junction box sleeves. There will also be 1 8x10 concrete vault installed for a switch at the most west station. Most of these locations will have GE fiber splice boxes (25) installed next to the equipment. Each 1-phase trench will contain 1 2" conduit and 1 3" conduit. Where the 2 3-phase circuits are running side by side the trench will contain 1 2" conduit and 6 3" conduits. Once the express run is on its own to the east of the ranger station, the trench will contain 1 2" conduit and 3 3" conduits. The other project is installing a new UG distribution line service along Highway 22 from Detroit to Idanha. The scope of the work includes trenching/boring and installing conduit, sleeves, and pedestals for a 3-phase underground circuit. There will also be a few 1-phase taps. The material includes 6 1-phase pad-mount transformer sleeves and 22 3-phase junction box sleeves. There will also be 1 8x10 concrete vault installed for a switch at the most west station. Most of these locations will have GE fiber splice boxes (29) installed next to the equipment. Each 1-phase trench will contain 1 2" conduit and 1 3" conduit. Each 3-phase trench will contain 1 2" conduit and 3 3" conduits. Bidder Question Deadline 2/24/2023 @ 5pm Commence Construction 4/1/2023 or earlier Complete Construction 6/1/2024 with weather contingency |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |