Similar Projects
Hayward - Brule Construction / Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$750,000 CJ est. value
Solon Springs, WI 54873

Hayward - Brule Construction / Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$750,000 CJ est. value
Solon Springs, WI 54873

UW Superior - ESPC - 1 MW Solar Array - University of Wisconsin System - Administration
Infrastructure
Design
$1,651,000 est. value
Superior, WI

Barstow Science Laboratory and Applied Research Renovation GPC
Infrastructure
Bidding
$2,760,000 CJ est. value
Superior, WI 54880

Pond Maintenance
Infrastructure
Post-Bid
Superior, WI 54880

Poly Fiber Flex Patch
Infrastructure
Post-Bid
Gordon, Minong, WI 54859

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Asphalt Milling 2021
Results
Superior, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Scrub Seal with Fog Seal over Asphalt Road
Infrastructure
Post-Bid
Gordon, Minong, WI 54838

2021 CDBG and CIP Sidewalk Replacement
Results
Superior, WI

2022-23 Blacktop Resurfacing - Hot Mix Bond Leader Lake Road to Leader Lake Road
Infrastructure
Post-Bid
Minong, WI 54859

Brule - Ino, Sznaider Road to CTH A; Wentworth - Ino, Clevedon Road to Sznaider Road;
Infrastructure
Results
$100,000 est. value

Blacktop Surfacing - Warm Mix Asphalt - 2022
Infrastructure
Post-Bid
Minong, WI 54859

Last Updated 11/17/2022 05:35 AM
Project Title

Port Wing - Superior; CTH H to Engdahl Road

Physical Address View project details and contacts
City, State (County) Maple, WI 54854   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $11,692,839 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Port Wing - Superior, CTH H to Engdahl Road; Douglas County; 8510-01-70; STH 13; 15.770 Miles; Base, HMA Pavement, Asphaltic Surface, Curb and Gutter, Beam Guard, Pavement Marking, and Culvert Replacements. Estimated Range $10,000,000 - $10,999,999 DBE Goal: NA Contract Completion Time: 65 Working Days With each sealed proposal, the bidder must include a properly executed bid bond or a cashier's check, certified check, bank's check, or postal money order in the amount designated on the Highway Work Proposal made payable to the Department. Certified checks shall be drawn on the account of the bidder submitting the proposal. The bidder may also satisfy the proposal guaranty requirements by having a properly executed annual bid bond on file with the Department. Contractors should submit all questions concerning plans and/or proposals through Website. This process is documented and can be found at Website. WisDOT -11 - Port Wing - Superior, CTH H to Engdahl Road *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents