Similar Projects
Augusta Regional Airport Baggage Handling System Replacement
Results
Augusta, GA 30900

General Aviation Terminal Development
Results
$2,500,000 to $4,500,000 est. value
Perry, GA 31088

Airfield Maintenance (MATOC Contract), North Carolina, South Carolina and Georgia
Design
$250,000 to $45,000,000 est. value
Savannah, GA

Design-Build Services for New 12-Unit Nested Air Craft T-Hangar
Results
$1,050,000 to $1,150,000 est. value
Hinesville, GA 31313

Downtown Atlanta Greyhound Intercity Bus Facility
New Construction - 14,000 SF
Construction
$8,500,000 est. value
Atlanta, GA 30303

Construct Air Cargo Apron
Results
Savannah, GA 31408

Improvements to the Airport
Post-Bid
Metter, GA

Fire Life Safety Enhancement Project
Results
Atlanta, GA 30320

General Aviation Terminal and Hangar Complex Development
New Construction - 52,500 SF
Results
Albany, GA 31701

Airport Terminal Building
New Construction - 4,300 SF
Bidding
Jasper, GA 30143

Design-Build Services for an Airport Terminal Building and Area Improvements
Construction
Hampton, GA 30228

Reported 11/05/2021 12:00 AM
Project Title

Concourse D Widening

Physical Address View project details and contacts
City, State (County) Atlanta, GA   (Clayton County)
Category(s) Transportation
Sub-Category(s) Airline/Passenger Terminal
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Concourse D Widening project will increase the overall building footprint by widening the existing concourse from 60 feet to 102 feet. It also extends the existing concourse to the north and south increasing the overall length of the concourse by approximately 145 feet. The scope will require, but not be limited to the following activities to support the proposed project: architectural, signage, MEP infrastructure, structural, civil, low voltage systems, and aircraft parking gate layout, passenger boarding bridges, and aircraft fueling. All these activities will occur while existing operations in the vicinity continue.

Details

Airline/Passenger Terminal, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents