Similar Projects
Valley View Center for Nursing Care Addition - RTU
Alteration
Design
Greenvale, NY 11548

HVAC Data Center Project
Renovation
Sub-Bidding
$600,000 CJ est. value
Garden City, NY 11530

Air Conditioning at Phipps Administration Building
Renovation
Sub-Bidding
$400,000 CJ est. value
Great Neck, NY 11020

HVAC & Refrigeration Replacement & Maintenance For Lukoil Service Stations
Alteration
Post-Bid

Heating and Air Conditioning Periodic Maintenance
Term Contract
Post-Bid
Oyster Bay, NY

Vestibule and Reading Room Window Replacement and HVAC Upgrades
Alteration
Results
$350,050 est. value
Bellmore, NY 11710

Tully Park HVAC Improvements
Alteration
Results
New Hyde Park, NY 11040

Unit Ventilator Replacement at California Avenue Elementary School - Contract H HVAC Work
Renovation
Sub-Bidding
$400,000 CJ est. value
Uniondale, NY 11553

HVAC Service
Term Contract
Post-Bid
Oyster Bay, NY

Maintenance and Repair of HVAC Equipment and Associated Automatic Temperature Controls
Alteration
Results
Hempstead, NY

Repair to Air Conditioning Units and Mold Remediation
Renovation
Sub-Bidding
$200,000 CJ est. value
Kings Point, NY 11024

Maintenance and Repair of Pneumatic and HVAC System and ANCI
Term Contract
Post-Bid
NY

Village Hall HVAC Replacement
Alteration
Results
Rockville Centre, NY 11570

On-Call HVAC Services
Term Contract
Sub-Bidding
North Hempstead, NY 11050

Maintenance and Repair of HVAC for Water Department
Term Contract, Alteration
Post-Bid
Hempstead, NY

Last Updated 02/07/2023 01:07 PM
Project Title

Unit Ventilator Replacement Mineola High School Contract H - Hvac Work

Physical Address View project details and contacts
City, State (County) Garden City Park, NY 11040   (Nassau County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $938,000 [brand] Estimate
Plans Available from Copy Center - 01/16/23
Owner View project details and contacts
Architect View project details and contacts
Description

Make deposit check payable to the Mineola Union Free School District. Bidder's deposit will be refunded if the set is returned in good condition within thirty (30) days following the award of the contract or the rejection of the bids covered by such plans and specifications. Non-bidders shall receive partial reimbursement, in an amount equal to the amount of the deposit, less the actual cost of reproduction of the documents if the set is returned in good condition within thirty (30) days following the award of the contract or the rejection of the bids covered by such plans and specifications. Any bidder requiring documents to be shipped shall make arrangements with the printer and pay for all packaging and shipping costs. Bids must be made in the standard proposal form in the manner designated therein and as required by the specifications that must be enclosed in sealed envelopes bearing the name of the job and name and address of the bidder on the outside, addressed to: "MINEOLA UNION FREE SCHOOL DISTRICT", clearly marked on the outside: Bid For: Mineola Union Free School District Unit Ventilator Replacement at the Mineola High School. Each proposal submitted must be accompanied by a certified check or bid bond, made payable to the "MINEOLA UNION FREE SCHOOL DISTRICT", in an amount equal to five percent (5%) of the total amount of the bid, as a commitment by the bidder that, if its bid is accepted, it will enter into a contract to perform the work and will execute such further security as may be required for the faithful performance of the contract. Certification of bonding company is required for this bid, see Instructions for Bidders section. Each bidder shall agree to hold his/her bid price for sixty (60) days after the formal bid opening. is the Board's intention, and it reserves its right to award the contract to the lowest responsible qualified bidder, providing the required security who, to the Board's satisfaction, meets the experience, technical, budget and all specification requirements and has references and responses from references that are deemed acceptable by the Board. The Board reserves the right to reject any or all bids, or portions thereof, or alternates, or alternatives, to waive any informality and to accept such bids, or portions thereof, or alternates, or alternatives which, in the opinion of the Board, are in the best interests of the School District. Liquidated damages - his Project is to be physically completed in accordance with the time limits set forth in the agreement between the Owner and the Contractor and as further setforth in the Project Manual and/ or bidding documents. Liquidated damages will be assessed in the amount of $1,000.00 for each and every calendar day after such time allowed for completion

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents