Similar Projects
Indian Hills Sewer Extension
Infrastructure
Bidding
$830,000 to $900,000 est. value
Silver City, NM

Kirtland Interceptor Rehabilitation Construction
Infrastructure
Bidding
$200,000 est. value
Albuquerque, NM

Hazard Mitigation and Stabilization for Sewer Lines
Post-Bid
$15,000,000 to $20,000,000 est. value
Ruidoso, NM 88345

On-site Residential Potable Water Cistern Systems and Wastewater Septic Disposal Systems
Post-Bid
Shiprock, NM 87420

Wastewater Collection System Expansion
Results
Edgewood, NM

Mesquite-Brazito Wastewater System Improvements
Results
Less than $6,101,583 est. value
La Mesa, NM

Brittany Estates and Estados Serenos Sewer Extension and Waterline
Infrastructure
Bidding
$500,000 est. value
Las Cruces, NM

Lea County Airport Water and Sewer Extension
Post-Bid
Hobbs, NM 88240

Utility On-Call
Term Contract
Results
$2,098,419 est. value
Los Lunas, NM 87031

Pueblo de San Ildefonso Wastewater System Improvements Project Phase 2
Infrastructure
Bidding
$400,000 est. value
Santa Fe, NM

Wastewater System Improvements
Post-Bid
Maxwell, NM

Mescalero Scattered Sites (Martinez & Weinbrenner)
Results
$25,000 to $100,000 est. value
Mescalero, NM

Septic Tank Pumping District 5
Term Contract, Infrastructure
Bidding
Santa Fe, NM

On-Call Utility Repair
Post-Bid
Los Alamos, NM

Sandhill Sewer Interceptor - Phase II
Results
$1,280,400 est. value
Las Cruces, NM 88004

Last Updated 05/09/2022 05:25 AM
Project Title

East Sanitary Sewer Interceptor Rehabilitation Phase 3

Physical Address View project details and contacts
City, State (County) Farmington, NM   (San Juan County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,850,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under this contract shall consist of furnishing labor, equipment, and materials necessary to execute the installation of approximately 3,000 LF of 24” Fiberglass Reinforced Polymer Mortar (FRPM) or Cured-in Place Pipe (CIPP) Liner sewer pipe within an existing 27-inch reinforced concrete pipe using slip lining or other trenchless techniques; execute the installation of approximately 5,700 LF of 21” Spiral Wound PVC Liner or Cured-in Place Pipe (CIPP) Liner sewer pipe within an existing 21-inch reinforced concrete pipe using slip lining or other trenchless techniques. Installation of Fiberglass Reinforced Manhole liners or PVC Manhole Liners in existing manholes, connections to existing manholes, Point Repair, Re-connect existing sanitary sewer services, other appurtenances and asphalt removal and replacement.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents