Similar Projects
Last Updated | 05/09/2022 05:25 AM |
Project Title | East Sanitary Sewer Interceptor Rehabilitation Phase 3 |
Physical Address | View project details and contacts |
City, State (County) | Farmington, NM (San Juan County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sanitary Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $2,850,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work to be performed under this contract shall consist of furnishing labor, equipment, and materials necessary to execute the installation of approximately 3,000 LF of 24” Fiberglass Reinforced Polymer Mortar (FRPM) or Cured-in Place Pipe (CIPP) Liner sewer pipe within an existing 27-inch reinforced concrete pipe using slip lining or other trenchless techniques; execute the installation of approximately 5,700 LF of 21” Spiral Wound PVC Liner or Cured-in Place Pipe (CIPP) Liner sewer pipe within an existing 21-inch reinforced concrete pipe using slip lining or other trenchless techniques. Installation of Fiberglass Reinforced Manhole liners or PVC Manhole Liners in existing manholes, connections to existing manholes, Point Repair, Re-connect existing sanitary sewer services, other appurtenances and asphalt removal and replacement. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |