Last Updated | 12/02/2022 02:14 PM |
Project Title | Roof Replacement for 291 Ensminger Road, Senior Center |
Physical Address | View project details and contacts |
City, State (County) | Tonawanda, NY 14150 (Erie County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $1,399,027 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project consists of the removal and replacement of the existing roof system, roof edge metals, fascia, coping, base flashing, wall panels, and miscellaneous abatement. Raising and resetting of the existing roof top equipment. Replacement of the existing roof drain bodies, rings, and strainers above the roof system. Added roof drains as indicated on the drawings. Removal and reinstallation of ACT ceiling and grid system to facilitate plumbing installations and other work indicated in the Contract Documents. CR Number: 2091555 Service-Disabled Veteran-Owned Set Aside: No Total MWBE Participation Goals: 5.0% Service-Disabled Veteran-Owned Business Contracting Goal: 0% Disadvantaged Owned Sub-Contracting Goal: 0% Contract term: 2022-2023 County(ies): All NYS counties The Work of Project is defined by the Contract Documents and consists of the following: 1. Removal and replacement of the existing roof system, roof edge metals, fascia, coping, base flashing, wall panels and miscellaneous abatement. Raising and resetting of the existing roof top equipment. Replacement of the existing roof drain bodies, rings, and strainers above the roof system. Added roof drains as indicated on the drawings. Removal and reinstallation of ACT ceiling and grid system to facilitate plumbing installations and other Work indicated in the Contract Documents. 2. Related work with other contracts: Successful Contractor will coordinate work with the Owners representative and the Solar Array contractor for the removal and reinstallation of the existing solar array system. 3. Roofing Contractor is responsible for the support systems as indicated on the drawings for the electrical items traversing across the new roof system for the solar array, excluding the solar panels, ballast and inter connections. Items include but are not limited to electrical conduits, junction boxes, etc. at the roof surface only. Supports and attachments for the extensions of conduits etc. that traverse over the roof edges and down the existing exterior walls and beyond are the responsibility of the solar array contractor. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |