Similar Projects
Coating of Concrete Floors at Animal Services Facility
Alteration
Bidding
Fayetteville, NC 28306

Remove and Replace Fayetteville FMS11 Facility Floors
Post-Bid
Less than $44,575 est. value
Fayetteville, NC 28306

Axminster Carpet Replacement
Post-Bid
Raleigh, NC 27602

Z--Refinishing of Gymnasium Floors
Results
Camp Lejeune, NC

B-8052 Repair Flooring Food Services Bogue Mess Hall
Results
Less than $25,000 est. value
Newport, NC 28570

Warehouse Floor Repair
Post-Bid
Rocky Mount, NC 27801

ADA Detectable Warning Tiles
Results
Greensboro, NC 27402

Fire Station 8 Apparatus Bay Floor Resurfacing
Post-Bid
Asheville, NC 28805

Sturgeon City Lab Floor Tile Replacement
Results
Less than $3,006 est. value
Jacksonville, NC 28540

Floor Repairs - AASF Flight Facility
Post-Bid
Morrisville, NC 27560

Indoor Basketball Court Replacements
Results
Winston-Salem, NC 27107

Concourse A / Atrium Flooring Repair - Terrazo
Post-Bid
Charlotte, NC 28208

NCMA Flooring Replacement - Fort Bragg
Results
Fort Bragg, NC

Furnishing and Installation of Carpet at Multiple County
Post-Bid
Hendersonville, NC 28792

Fourth Floor Cancer Hospital Flooring Replacement Project
Results
$2,020,995 est. value
Durham, NC

Reported 01/28/2022 12:00 AM
Project Title

New Hanover High School Brogden Gym Floor Replacement Project

Physical Address View project details and contacts
City, State (County) Wilmington, NC 28401   (New Hanover County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

New Hanover High School Brogden Hall Gymnasium Floor includes structural repairs to the foundations under the gymnasium portion of the Brogden Hall building. Additionally, the concrete floor slab requires structural reinforcement/replacement. The project will involve the relocation of PME currently in the crawl space below the floor, demolition of the foundations/concrete slab as required, installation of new foundation and concrete slab, as well as new finishes that may be required after structural work is complete.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents