Similar Projects
2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

Cold Mix Resurfacing
Alteration
Post-Bid
Monticello, IL

Monticello High School Track Asphalt Reconstruction
Results
Less than $100,000 est. value
Monticello, IL 61856

Willow Branch Township Road District Improvements
Results
Cisco, IL

Road Improvements
Alteration
Post-Bid
Monticello, IL

Sangamon Township Road Improvements
Results
IL

Pavement Patching
Infrastructure
Post-Bid
Mansfield, IL 61854

County Roads Seal Coat
Results
Monticello, IL

Seal Coating of Various Streets
Infrastructure
Post-Bid
$300,000 est. value
Bement, IL

Sage Drive, William Street and Charter Street MFT
Results
Monticello, IL

A-1 Seal of Various Village Roads
Infrastructure
Results
Mansfield, IL

CERL - Farber Drive Entrance Extension
Infrastructure
Results
$337,677 est. value

Full Depth Cement Stabilization
Infrastructure
Results
$30,000 to $50,000 est. value
Bement, IL

RR-21-4821 Pavement Repairs
Infrastructure
Results

567.5 Miles of Spraying, Approximately 2004 Acres on State Right of Way Along US 51 and Interstate Routes including interchanges
Infrastructure
Results

Reported 06/18/2022 12:00 AM
Project Title

ILL 105 South of Cerro Gordo: 1.5" HMA Inlay for 700 FT; Ill 105 at Monticello Near 1-72 Ramps: 1.5" HMA Inlay for 1,100 FT

Physical Address View project details and contacts
City, State (County) IL   (Piatt County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $219,174 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a road / highway in Bement, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway. ILL 105 South of Cerro Gordo: 1.5" HMA Inlay for 700 FT; ILL 105 at Monticello near 1-72 ramps: 1.5" HMA Inlay for 1,100 FT. Region 3 District 5 Federal Project # N/A County(s) Piatt Key Route(s) FAP 741 Marked Route(s) IL 105 Section(s) (10I,7I) State Job #(s) C-95-029-22 PPS #(s) 0-02176-5016 Completion Date : 15 Working Days Questions not accepted as of April 19, 2022 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashiers check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared not responsive, it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractors Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 08, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 237 HMA Inlay \

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents