Similar Projects
Intersection Safety Improvements - US 15/SC 61
Infrastructure
Bidding
$2,000,000 CJ est. value
Walterboro, SC 29488

Intersection Safety Improvements - US 15/SC 61
Infrastructure
Bidding
$2,000,000 CJ est. value
Walterboro, SC 29488

Asphalt Repair and Concrete Addition
Post-Bid
$17,000 est. value
Sumter, SC 29153

Manning Road Fire Station Driveway Replacement
Post-Bid
Sumter, SC 29150

Preservation - Sumter Co
Infrastructure
Results
SC

ADA Ramp at Shaw Height Elementary
Alteration
Results
$77,875 est. value
Shaw Air Force Base, Sumter, SC 29152

Carter Road Self-Storage
New Construction, Infrastructure - 43,048 SF
Pending Verification
$5,000,000 CJ est. value
Sumter, SC 29150

Carter Road Self-Storage
New Construction, Infrastructure - 43,048 SF
Pending Verification
$5,000,000 CJ est. value
Sumter, SC 29150

Raceway #1531- The Retreat / Sumter
New Construction, Infrastructure - 3,705 SF
Bidding
$1,300,000 CJ est. value
Sumter, SC 29150

State Street Resurfacing FY 21/22
Infrastructure
Post-Bid
Sumter, SC

Safety Improvements - US 76 (Sumter)
Infrastructure
Results
SC

US 15 Highway Funeral Home
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Sumter, SC 29150

Paving
Infrastructure
Bidding
$200,000 CJ est. value
Sumter, SC 29150

City Street Resurfacing FY 21/22
Infrastructure
Post-Bid
Sumter, SC

Reconstruction of County Roads - 2021
Infrastructure
Results
Sumter, SC

Last Updated 08/19/2022 07:03 AM
Project Title

Sumter- Rotary Plaza

Physical Address View project details and contacts
City, State (County) Sumter, SC 29150   (Sumter County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the demolition and installation of concrete sidewalks, brick paving, plantings, irrigation concrete benches and brick planters within the SCDOT Right of Way, at the corner of Main Street and Liberty Street. Prior experience, qualifications and product certification will be required.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents